(1) Install the bonding strips (81) and the bolts (82). NOTE : Do an electrical bonding when you install the bolts (82)
____
(Ref. TASK 20-28-00-912-004).
Subtask 54-50-00-420-054
F. Installation of the Electrical Systems
NOTE : Do not cross the electrical cables in the pylon during the
____
installation.
(1)
Put blanking caps on the disconnected electrical connectors.
(2)
Make sure that the electrical connectors are clean and in the correct condition.
(3)
Put the cables in position at the pylon.
1EFF : ALL 1 54-50-00Page 431 1 1 Nov 01/03R 1 1 1CES 1
(4) Connection of the electrical feeders on the right side of the pylon (Ref. Fig. 404/TASK 54-50-00-991-012)
(a)
Install the tension regulator cable (32) in the engine electrical box 401VC.
(b)
Install the washers (40), the bolts (41), the nuts (39) and tighten the nuts (39).
(c)
Install the plate (38) on the engine electrical box, install the bolts (37) and tighten them.
(d)
Put the clamp (36) in position on the pylon secondary structure.
(e)
Install the washer (47), the bolt (35), the nut (46) and tighten the nut (46).
(f)
Install the clamp (31) in position on the pylon secondary structure.
(g)
Install the washer (33), the bolt (34) and tighten the bolt (34).
(h)
Install the four electrical feeders on the plate 400VT (43) with the nuts (44).
R (i) Install the cover (42) and the new corrosion resistant steel R lockwire 0.8 mm (0.32 in.) dia. MISCELLANEOUS (Material No. 19-R 010) on this plate.
(j)
Install the 13 cable supports (54) on the pylon secondary structure with the washers (52), the bolts (53) and the nuts (51).
(k)
At RIB09, install the cable support (56) on the pylon secondary structure with the bolts (57) and the nuts (55).
(5)
Connection of the electrical connectors at RIB7A
(Ref. Fig. 405/TASK 54-50-00-991-013)
(a)
For the left pylon, connect the connectors: 471VC, 473VC, 475VC.
(b)
For the right pylon, connect the connectors: 470VC, 472VC, 474VC.
(6)
Connection of the electrical connectors at the wing closing rib (Ref. Fig. 406/TASK 54-50-00-991-014)
(a)
Put the assembly electrical cables and plate (61) in position at the wing closing rib.
(b)
Install the washers (74), the bolts (73) and tighten the bolts (73).
NOTE : Do an electrical bonding when you install the bolts (73)
____ of the plate (61) (Ref. TASK 20-28-00-912-003).
(c)
Install the washer (68) and the clamp (67).
(d)
Install the washer (72) and the clamp (71).
(e)
Install the spacer (66), the washer (65) and the clamp (63).
(f)
Install the bolt (64), the washer (69) and the nut (70).
(g)
Connect the seven electrical connectors on the plate (62): 1 for the left pylon: 411VC, 413VC, 415VC, 417VC, 419VC, 421VC,
_
423VC.
2 for the right pylon: 410VC, 412VC, 414VC, 416VC, 418VC, 420VC,
_
422VC.
Subtask 54-50-00-420-058
G. Connection of the Bleed Air Duct
(Ref. Fig. 403/TASK 54-50-00-991-006)
(1)
Put blanking plugs on the disconnected line ends.
(2)
Install the clamp (22), (24) and the sleeve assembly (23).
R (3) Connect the temperature sensor 6HA1 (6HA2) (21). Subtask 54-50-00-420-059
H. Connection of the Fuel/Defuel System Components NOTE : Do an electrical bonding when you install the bolt (7) and the
____
screws (6) (Ref. TASK 20-28-00-912-002).
(1)
Remove the blanking plugs from the disconnected line ends.
(2)
Connection of the fuel line coupling at RIB3 (Ref. Fig. 402/TASK 54-50-00-991-005)
(a)
Install the new O-ring (11) and the O-ring (14).
(b)
Put the clamp (16) in position.
(c)
Engage the connector (12) on the clamp (16).
(d)
Install the nuts (2) and (13).
(e)
Install the ring retainers (3) and (4).
(f)
Safety the nuts (2 and (13) with corrosion resistant steel lockwire 0.8 mm (0.32 in.) dia. MISCELLANEOUS (Material No. 19-010).