Outer and Inner Fittings at RIB4 Figure 609/TASK 54-51-00-991-006
R 1EFF : 1 1 1CES ALL 1 111 54-51-00 Page 646 May 01/00
5. Close-up
________
Subtask 54-51-00-440-058
A. Aircraft Maintenance Configuration
(1) Make the thrust reverser serviceable (Ref. TASK 78-30-00-081-041). Subtask 54-51-00-410-057
B. Close Access
(1)
Install the panels.
(a)
For the left pylon: 414FR, 471AL, 472AR.
(b)
For the right pylon: 423FL, 481AL, 482AR.
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
(3)
Remove the access platform(s).
(4)
Remove the warning notice(s).
R 1EFF : ALL 1 54-51-00Page 647 1 1 May 01/00 1 1 1CES 1
TASK 54-51-00-200-007
R Special Detailed Inspection of Pylon-to-Wing Forward Attachment Shackles at RIB4
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
1. Reason for the Job
__________________
Refer to the MPD TASK: 545115-02
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice
No specific access platform 1.5 m (4 ft. 11 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004 USA MIL-T-81533
1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
(Ref. 20-31-00)
Material No. 19-003 USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
R 1EFF : ALL 1 54-51-00Page 648 1 1 May 01/00 1 1 1CES 1
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
36-11-48-000-004 Removal of the Bleed Air Ducts 36-11-48-400-004 Installation of the Bleed Air Ducts NTM 545115,P.Block-401 SRM 511100,P.Block 001 (for corrective action) SRM 512200,P.Block 001 (for corrective action) 54-51-00-991-055 Fig. 610 54-51-00-991-059 Fig. 611
3. Job Set-up
__________ Subtask 54-51-00-941-058
A. Safety Precautions
(1)
On the center pedestal, on the ENG panel 115VU:
(a) Put a warning notice to tell persons not to start the engine.
(2)
Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM NACELLES/PYLONS(31)