• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:52来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 A. Inspection (Ref. Fig. 613/TASK 54-51-00-991-062) 
R  (1) Do a detailed inspection of the shackles, sleeves and bolts of the pylon-to-wing attachment fittings at RIB4. 

R 1EFF : ALL 1 54-51-00Page 662 1 1 Aug 01/03 1 1 1CES 1


 Shackles, Sleeves and Bolts of the Pylon-to-Wing Attachment Fittings at RIB4 Figure 613/TASK 54-51-00-991-062
 1EFF : ALL 1 54-51-00Page 663 1 1 Aug 01/03R 1 1 1CES 1


 (2) Make sure that there is no:
R R R  (a) Corrosion damage: - If you find corrosion damage, refer to the Structural Repair Manual (Ref. SRM 512200-P.Block001) for types of corrosion, inspection, removal and corrosion protection.
R R R  (b) Other damage (cracks, scratches, stress, marks, dents, bumps,...): - If you find other damage, refer to the Structural Repair Manual (Ref. SRM 511100-P.Block001) for damage classification and associated corrective action.
 5. Close-up________
 Subtask 54-51-00-420-055 
R  A. Installation of the Components
 (1) Install the bolts, the sleeves and the shackles (Ref. TASK 54-51-17-400-001).
 Subtask 54-51-00-410-060
 B. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.
 (2) Remove the access platform(s).
R  (3) Remove the warning notice(s). 


 TASK 54-51-00-200-010


R Detailed Inspection of Pylon Spigot Receptacle Upper Surface, including Fitting R Bore, and Upper Spar Surrounding Surface
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 545117-01
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice R No specific access platform 2.5 m (8 ft. 2 in.)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004  USA MIL-T-81533
 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
 (Ref. 20-31-00)

 Material No. 19-003  USA AMS 3819
 LINT-FREE COTTON CLOTH (Ref. 20-31-00)

 

 C. Referenced Information

 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R  54-51-21-000-001 Removal of the Pylon Lateral Access-Doors
R  54-51-21-400-001 Installation of the Pylon Lateral Access-Doors 54-51-41-000-001 Removal of the Spigot Ball Joint 54-51-41-400-001 Installation of the Spigot Ball Joint
R 78-30-00-081-041 Make the Thrust Reverser Serviceable after Maintenance 78-30-00-481-041 Make the Thrust Reverser Unserviceable for
 Maintenance
 SRM 511100-P.Block001
 SRM 512200-P.Block001
 54-51-00-991-009 Fig. 614

 3. Job Set-up
__________
 Subtask 54-51-00-941-061
 A. Safety Precautions
 (1)
 On the center pedestal, on the ENG panel 115VU:

 (a) Put a warning notice to tell persons not to start the engine.

 (2)
 Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.

 (3)
 On the overhead maintenance panel 50VU:

 (a)
 Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.

 (b)
 Put a warning notice to tell persons not to energize the FADEC.

 

 


 Subtask 54-51-00-010-060

 B. Get Access
 (1)
 Put an access platform in position:

 (a)
 At zone 410 for the left pylon.

 (b)
 At zone 420 for the right pylon.

 

 (2)
 Remove the access panels:


 (a) For the left pylon: 471AL, 471BL, 472AR, 472BR.
 (b) For the right pylon: 481AL, 481BL, 482AR, 482BR. R (3) Remove the pylon lateral access-doors (Ref. TASK 54-51-21-000-001):
 (a) For the left pylon: 425BL, 425BR.
 (b) For the right pylon: 415BL, 415BR.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM NACELLES/PYLONS(35)