(d)
Install the clamps (13) and (2) and the bolt (1) on the support (12).
(e)
Tighten the bolt (1).
(f)
Install new cable ties (5).
(2)
Install the bleed air ducts:
-
between the closing rib and the pylon,
-
between the pylon and the anti-ice valve (Ref. TASK 36-11-48-400-004).
Subtask 54-51-00-410-058
B. Close Access
(1)
Install the panels.
(a)
For the left pylon: 414FR, 471AL, 472AR, 521BT.
(b)
For the right pylon: 481AL, 482AR, 423FL, 621BT.
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
(3)
Remove the access platform(s).
(4)
Remove the warning notice(s).
R 1EFF : ALL 1 54-51-00Page 654 1 1 May 01/00 1 1 1CES 1
TASK 54-51-00-200-008
R Detailed Inspection of Pylon to Wing Forward Attachment Shackles at RIB 4
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
1. Reason for the Job
__________________
Refer to the MPD TASK: 545115-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice R No specific access platform 2.5 m (8 ft. 2 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004 USA MIL-T-81533
1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
(Ref. 20-31-00)
Material No. 19-003 USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
SRM 511100-P.Block001
SRM 512200-P.Block001
54-51-00-991-007 Fig. 612
3. Job Set-up__________
Subtask 54-51-00-941-059
A. Safety Precautions
R (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a warning notice to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overheat maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a warning notice to tell persons not to energize the FADEC.
Subtask 54-51-00-010-058
B. Get Access
R (1) Put an access platform in position.
R (a) At the zone 410 for the left pylon.
R (b) At the zone 420 for the right pylon.
(2) Remove the access panels:
(a) For the left pylon: 414FR, 471AL, 472AR, 521BT.
(b) For the right pylon: 481AL, 482AR, 423FL, 621BT.
Subtask 54-51-00-110-060
C. Cleaning of the Structure
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
R R R (1) Clean the inspection area with CLEANING AGENTS (Material No. 11-004) and a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003), if necessary.
4. Procedure_________
Subtask 54-51-00-220-059
A. Inspection (Ref. Fig. 612/TASK 54-51-00-991-007)
R R (1) Do a detailed inspection of the internal and external structure of the shackles at RIB4.
(2) Make sure that there is no: