C. Cleaning of the Structure WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the inspection area with CLEANING AGENTS (Material No. 11-004) and a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003), if necessary.
Subtask 54-51-00-040-059
D. Aircraft Maintenance Configuration
(1) Make the thrust reverser unserviceable (Ref. TASK 78-30-00-481-041). Subtask 54-51-00-020-062
E. Removal of the Spigot Ball Joint
(1) Remove the spigot ball joint (Ref. TASK 54-51-41-000-001).
4. Procedure
_________
Subtask 54-51-00-220-061
A. Inspection
(Ref. Fig. 614/TASK 54-51-00-991-009)
(1)
Do a detailed inspection of the upper surface of the pylon spigot receptacle. This inspection includes the fitting bore and the surface around the upper spar.
(2)
Make sure that there is no:
(a)
Corrosion damage:
-If you find corrosion damage, refer to the Structural Repair Manual (Ref. SRM 512200-P.Block001) for types of corrosion, inspection, removal and corrosion protection.
(b)
Other damage (cracks, scratches, stress, marks dents, bumps,...):
-If you find other damage, refer to the Structural Repair Manual (Ref. SRM 511100-P.Block001) for damage classification and related corrective action.
Subtask 54-51-00-420-062
B. Installation of the Spigot Ball Joint
(1) Install the spigot ball joint (Ref. TASK 54-51-41-400-001).
5. Close-up
________
Subtask 54-51-00-440-059
A. Aircraft Maintenance Configuration
(1) Make the thrust reverser serviceable (Ref. TASK 78-30-00-081-041). Subtask 54-51-00-410-061
B. Close Access R (1) Install the pylon lateral access-doors (Ref. TASK 54-51-21-400-001):
(a)
For the left pylon: 425BL, 425BR.
(b)
For the right pylon: 415BL, 415BR.
R R Pylon Spigot - Receptacle Fitting Figure 614/TASK 54-51-00-991-009
1EFF : 1 1 1CES ALL 1 111 54-51-00 Page 669 Feb 01/02
R (2) Install the panels:
(a)
For the left pylon: 471AL, 471BL, 472AR, 472BR.
(b)
For the right pylon: 481AL, 481BL, 482AR, 482BR.
(3)
Make sure that the work area is clean and clear of tool(s) and other items.
(4)
Remove the access platform(s).
(5)
Remove the warning notice(s).
TASK 54-51-00-200-011
R Detailed Inspection of Pylon to Wing Attach Fitting Lugs at RIB 10
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
1. Reason for the Job
__________________
Refer to the MPD TASK: 545120-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice R No specific access platform 2.50 m (8 ft. 2 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004 USA MIL-T-81533
1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
(Ref. 20-31-00)
Material No. 19-003 USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
78-30-00-081-041 78-30-00-481-041 SRM 511100-P.Block001 SRM 512200-P.Block001 54-51-00-991-010 Make the Thrust Reverser Serviceable after MaintenanceMake the Thrust Reverser Unserviceable for MaintenanceFig. 615
3. Job Set-up__________
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM NACELLES/PYLONS(36)