R Installation of the Thrust Reverser Cowl Fitting at RIB 1 and RIB 2 R 1. Reason for the Job
__________________ R Self Explanatory R 2. Job Set-up Information
______________________
R A. Consumable Materials
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R Material No. 05-047 C Z-11.904
R ANTI COR. COMPOUND(HIGH TEMP.SILICONE SEALANT)
R (Ref. 20-31-00)
R B. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 78-32-11-400-040 R R 54-57-17-991-003
R 3. Job Set-up
__________ R Subtask 54-57-17-860-052
Installation of the Left or Right Half Door of Thrust Reverser Fig. 402
R A. Aircraft Maintenance Configuration
R (1) Make sure that the access platform and the warning notices are in R position.
R 4. Procedure
_________
R Subtask 54-57-17-420-053
R A. Installation of the Fitting at RIB1 and RIB2
R (Ref. Fig. 402/TASK 54-57-17-991-003)
R NOTE : The installation at Rib1 is the same for Rib2.____
R (1) Obey the location and thickness of the peel washers (9) recorded at
R the removal.
R (2) Put the shim (5) in the correct position on the pylon.
R (3) Put the thrust reverser cowl fitting (2) in position.
R (4) Install the wahers (4) on the bolts (3).
R (5) Install the bolts (3) with SPECIAL MATERIALS (Material No. 05-047).
R (6) Install the washers (7) and the nuts (8).
R (7) Tighten the nuts (8).
R 5. Close-up________
R Subtask 54-57-17-420-054
R A. Installation of Components
R (1) Install the thrust reverser cowl doors. (Ref. TASK 78-32-11-400-040)
R Subtask 54-57-17-410-052
R B. Close Access
R (1) Install the access panels:
R (a) for the left pylon: 415AL, 415AR.
R (b) for the right pylon: 425AL, 425AR.
R (2) Remove the access platform(s).
R (3) Remove the warning notice(s).
R (4) Make sure that the work area is clean and clear of tool(s) and other R items.
SEALING - REMOVAL/INSTALLATION
______________________________ TASK 54-57-22-000-001 Removal of the Apron Assemblies WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice
No specific access platform 1.2 m (3 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
78-36-00-010-040 Opening of the Thrust Reverser Doors 54-57-22-991-004 Fig. 401 54-57-22-991-005 Fig. 402
3. Job Set-up
__________ Subtask 54-57-22-941-050
A. Safety Precautions
(1)
On the center pedestal, on the ENG panel 115VU:
(a) Put a warning notice to tell persons not to start the engine.
(2)
Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3)
On the overhead maintenance panel 50VU:
(a)
Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b)
Put a warning notice to tell persons not to energize the FADEC 1(2).
Subtask 54-57-22-010-050
B. Get Access
(1)
Put the access platform in position:
(a)
At the zone 415 for the left pylon.
(b)
At the zone 425 for the right pylon.
(2)
Open the thrust reverser doors (Ref. TASK 78-36-00-010-040).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM NACELLES/PYLONS(114)