• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2012-03-16 12:23来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

5.1.1 Current Status of Training
System/Course  Service  Location  Duration  Throughput  Flt Hours  Staff 
Global Hawk  Air Force  Beale AFB, CA  10 
  Pilot  26 weeks  48/yr  32 
  Sensor Operator  12 weeks  18/yr  48 
  Maintenance  5 weeks  77/yr* 
Hunter  Army  Ft Huachuca, AZ  300**
  Internal Pilot  24 weeks  40/yr  21.5 
  External Pilot  16 weeks  4/yr  30
  Maintenance  10 weeks  20/yr
  Technician  11 weeks  20/yr 
Pioneer  Navy  OLF Choctaw, FL  37*****
  Mission Commander  3 weeks  17/yr  10 
  External Pilot  17 weeks  24/yr  102***
  Internal Pilot/Payload  Operator  14 weeks  40/yr  56
  Mechanical Maintenance  7 weeks  18/yr 
  Technical Maintenance  9 Weeks  24/yr 
Predator  Air Force  Indian Springs AFAF, NV  22 
  Pilot  13 weeks  48/yr  38 
  Sensor Operator  14 weeks  48/yr  37.5 
  Maintenance  4 weeks  95/yr**** 
Shadow  Army  Ft Huachuca, AZ  300**
  Operator  24 weeks  240/yr  14.5 
  Maintenance  8 weeks   40/yr
  Technician  9 weeks  40/yr 
*Number of graduates is total from the seven Global Hawk Maintenance courses. Duration is average length of the seven courses. **Total staff supporting Hunter and Shadow instruction at the U.S. Army UAS Training Center. ***Consists of some 80 hours flying subscale RC models plus 22 hours flying the Pioneer. **** Number of graduates is total from the five Predator Maintenance courses.  Duration is average length of the five courses. *****Total staff supporting Pioneer training at OLF Choctaw. 

5.1.2 Training Issues
1.  
Although a spiral acquisition approach is favored for most UAS programs, it imposes an unrecognized burden for UAS trainers:  always being one or more steps out of phase with the capabilities being incrementally fielded.  This requires additional training (i.e., cost) at the unit level after the student completes initial training.

2.  
Current ground stations are not designed to be dual capable for use in both controlling actual


SECTION 5 - OPERATIONS
Page 63
missions and conducting simulated flights for training.  This drives added product support costs for dedicated simulators and task trainers by requiring more numerous and higher fidelity simulators and trainers.
3.  
The current and projected OPTEMPO associated with the Global War On Terrorism (GWOT) does not allow systems to be taken off-line for extended periods of time in order to implement hardware and software improvements and to train operators on the new capabilities.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:无人机系统路线图 Unmanned Aircraft Systems Roadmap(67)