曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
TABLE D-1. FUTURE FUNDING OF DOD.
Laboratory Initiative Target UA(s) TRL Goal Budget Years Funding
Air Force Research Laboratory
Efficient Aerostructures Technology 6-FY13 FY04-09 $78.5 M
Materials Aero-morphing Hunter/Killer 6-FY10 FY04-09 $49.7 M
Composites Affordability Initiative (CAI) 6-FY05 FY04-05 $8.2 M
Affordable Composite Structures 6-FY12 FY04-09 $30.9 M
Full Spectrum Protection (FSP) 6-FY14 FY06-14 $41.5 M
Survivability Multiple Independent Levels of Security/Safety (MILS) 6-integrated system by FY09 FY03-06 $4.2 M
Survivable Integrated Inlet 6-FY07 FY04-09 $11.7 M
Propulsion & Power JP-8+100 Low Temperature Fuel (JP-8+100LT) Global Hawk 6-FY07 FY04-08 $3.1 M
Propulsion for J-UCAS J-UCAS 6-FY06 FY03-06 Navy $11.6 M AF $1.2 M
High Altitude Performance Improvements for the Global Hawk Engine Global Hawk 5-FY06 FY03-06 $0.8 M
High Altitude Power Improvements for the Global Hawk Engine Global Hawk 6-FY06 FY02-06 $ 8.2 M
Small High Bypass TurboFan for Small UA 6-FY05 FY01-05 $15 M
Propulsion for J-UCAS J-UCAS 6-FY06 FY03-05 AF - $.8 M, Navy - $2.4 M
Propulsion for J-UCAS J-UCAS 6-FY09 FY05-09 $7.7 M
Directed Energy Components 6-FY13 FY08-13 $31.5 M
Weapons & Targeting Technology High Capacity Information Connectivity for Aerospace Platforms (HICAP) 6-FY05 FY01-05 $2.6 M
Sensing Technology Polarimetric Imaging Laser Radar (PILAR) 6-FY05 FY04-05 $6.0 M
APPENDIX D – TECHNOLOGIES
Page D-11
Laboratory Initiative Target UA(s) TRL Goal Budget Years Funding
SPEctrally Aided Reconnaissance (SPEAR) 6-FY08 FY01-06 $7.7 M
Spectral Infrared Remote Imaging Transition Testbed (SPIRITT) 6-FY05 FY01-07 $52.0 M
X-Band Thin Radar Array 6-FY07 FY04-06 $9.7 M
Active Electronically Scanned Array (AESA) 5-Conformal Arrays by FY11 FY05-11 $7.8 M
Affordable Data links Components 6-FY14 FY06-14 $44.9 M
Structural Array Multi-Int TBM, DCA, Foliage Penetration (FOPEN), Electronic Attack (EA) Military Capability Technology 6-FY13 FY04-09 $87.3 M
Urban Ops Situation Awareness Technology 6-FY15 FY04-09 $19.3 M
Control Technology Validation and Verification (V&V) of Flight Critical Intelligent Software 6-FY11 FY04-09 $57.8 M
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:无人机系统路线图 Unmanned Aircraft Systems Roadmap(143)