• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-04 10:03来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 56-12-00
 ALL  ú ú B01 Page 6 ú Oct 25/85
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
AFT GLIDE
HANDLE
SEE A UPPER TRACK IDLER CAM
UPPER CAM GUARD LOCKPLATE
TRIGGER
UPPER CAMSHAFT
SPRING LOWER CAM FWD ROLLER WINDOW OPEN LOCK
BELLCRANK
LOWER
CAMSHAFT
BELLCRANK TURNBUCKLE OPEN LOCK
SPRING
RELEASE ROD ECCENTRIC
AFT ROLLER
BUSHING
DOOR ACCESS EXTERNAL  LINK  A  SEE  B  FWD 
LOWER TRACK 
BELLCRANK 
INBD 
TURNBUCKLE 

INBD
EXTERNAL HANDLE RELEASE
FWD EXTERNAL RELEASE HANDLE (RH ONLY)
B
Right Window No. 2 External Release Mechanism Figure 4
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 56-12-00
 ALL  ú ú B01 Page 7 ú Nov 15/87
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 WINDOW NO. 2 (PILOTS' SLIDING WINDOW) - REMOVAL/INSTALLATION
____________________________________________________________
 1.  General_______
 A.  There are two tasks in this procedure. There is one task for the removal and one task for the installation of the window No. 2.
 (1)  
The removal procedure has these parts:

 (a)  
The removal of electrical power

 (b)  
The removal of the rollers from the tracks

 (c)  
The removal of the electrical leads for the window heat system.

 

 (2)  
The installation procedure has these parts:

 (a)  
A check of the window adjustment

 (b)  
The connection of the electrical leads for the window heat system

 (c)  
The installation of the rollers into the tracks

 (d)  
A check of the window adjustment.

 


 TASK 56-12-11-004-008-B00
 2.  Window No. 2 (Pilots' Sliding Window) Removal_____________________________________________
 A.  Access
 (1)  Location Zone
 101, 102 Control Cabin

 B.  Prepare for the Window No. 2 Removal.
 S 864-001-B00
 WARNING:_______BE CAREFUL WHEN YOU DO WORK ON THE WINDOW NO. 2. THE OUTPUT VOLTAGE OF THE AUTOTRANSFORMER IS 250-350 VOLTS. THIS CAN CAUSE INJURY TO PERSONS.
 (1)  Make sure that the power is off in the window heat system.
 (a)  
Make sure that the window heat switches are in the OFF position.

 (b)  
Open these circuit breakers and attach the DO-NOT-CLOSE tags: 1) P6-12 panel a) WINDOW ANTI-ICE R


 2)  P6-11 panel
 a) WINDOW ANTI-ICE L

 C.  Remove the Window No. 2 (Fig. 401)
 S 984-002-B00
 (1)  
Unlock the window No. 2.

 S 984-003-B00

 (2)  
Move the window aft until the aft lower roller (10) is approximately


 2.50 inches from the locked open stop (8).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 56-12-11
 ALL  ú ú B01 Page 401 ú Nov 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
SEE A SEE A
1. UPPER ROLLER
2.
 WINDOW ASSEMBLY

3.
 ROLLER TRACK


4. FORWARD LOWER
11. UPPER
ROLLER TRACK
10. AFT
LOWER

5. CLOTHING GUARD ROLLER7. TRACK
 LIP SEE B
CUTOUT
6. TERMINAL  BOARD9. LOWER TRACK
8. LOCKED A
 OPEN
 STOP

B
Window No. 2 Installation
Figure 401

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 56-12-11
 ALL  ú ú B01 Page 402 ú Nov 15/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 WINDOWS(40)