Apply SEALANTS (Material No. 09-013) to the ground bonding attachment point.
(9)
Make sure that the bonding contact resistance between the power supply unit and the support is not higher than 10 milliohms (Ref. TASK 20-28-00-720-007).
Subtask 33-48-39-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
122VU LIGHTING/WING/STROBE 10LV V05
Subtask 33-48-39-710-050
D. Do the operational test of the anti-collision/strobe lighting (Ref. TASK 33-48-00-710-002).
5. Close-up
________ Subtask 33-48-39-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the access door 314AR.
(3) Remove the access platform(s). Subtask 33-48-39-862-050
B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
WING AND ENGINE SCAN LIGHTING - DESCRIPTION AND OPERATION
_________________________________________________________
1.
General
_______ The wing and engine scan lights illuminate the wing leading edge and the engine nacelle, on each side of the aircraft fuselage. These areas can be examined during the flight or on the ground.
2.
Component Location
__________________
(Ref. Fig. 001)
-------------------------------------------------------------------------------FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA | | | | DOOR | REF.
-------------------------------------------------------------------------------2LX SW-EXT LT/WING 25VU 210 3LX LT-WING & ENG SCAN, L 231 33-49-11 4LX LT-WING & ENG SCAN, R 232 33-49-11
3.
Description
___________ (Ref. Fig. 002) The wing and engine scan light system has two lights 3LX and 4LX with a fixed single filament. The lights are installed one on each side in the forward fuselage of the aircraft. An attached transformer gives the rated operation voltage to each light. Electrical power comes from the 115 VAC busbars 202XP and 103XP through the circuit breakers 1LX and 5LX.
4.
Operation
_________
(Ref. Fig. 002)
The switch 2LX is supplied with 115 VAC when:
-
the busbars 202XP and 103XP are energized,
-
the circuit breakers 1LX and 5LX are closed.
The wing and engine scan lights come on when the switch 2LX is in the ON
position.
Wing and Engine Scan Lights - Component Location
Figure 001
1EFF : ALL 1 33-49-00 Page 2
1 1 Feb 01/98
1 1
1CES 1
Wing and Engine Scan Lights - Schematic
Figure 002
1EFF : ALL 1 33-49-00 Page 3
1 1 Feb 01/98
1 1
1CES 1
WING AND ENGINE SCAN LIGHTING - DEACTIVATION/REACTIVATION
_________________________________________________________ TASK 33-49-00-040-001 Deactivation of the Wing and Engine Scan Light (3LX, 4LX)
1. Reason for the Job
__________________
Refer to the CDL TASK: 33-1
Wing/engine scan light cover 3(4) LX
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific soap solution No specific 1 WARNING NOTICE
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-065 C Z-24.380 EROSION PROTECTIVE TAPE (Ref. 20-31-00) Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
33-49-11-000-001 Removal of the Wing and Engine Scan Light (3LX, 4LX) 33-49-11-400-001 Installation of the Wing and Engine Scan Light (3LX, 4LX)
3. Job Set-up