R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 33-51-00Page 507 1201-299, 1May 01/05 1 1 1CES 1
3. Job Set-up
__________
Subtask 33-51-00-860-050
A. Aircraft Maintenance Configuration
(1)
Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
(2)
Energize the Cabin Intercommunication System (CIDS) (Ref. TASK 23-73-00-861-001).
Subtask 33-51-00-010-052
B. Open the access panels of the emergency power supply-units 10WL thru 13WL FOR 10WL 221BC (Ref. TASK 25-23-45-000-005) FOR 11WL 241KW (Ref. TASK 25-23-44-000-001) FOR 12WL 242KW (Ref. TASK 25-23-44-000-001) FOR 13WL 261CC (Ref. TASK 25-23-45-000-003).
Subtask 33-51-00-865-052
C. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU LIGHTING/EMER LT/CABIN 2WL H06 49VU LIGHTING/EMER LT/CABIN 1WL H05 122VU LIGHTING/CABIN/EMER/LT 3WL V07
4. Procedure
_________
Subtask 33-51-00-860-051
A. Preparation for Test
(1)
Make sure that the emergency escape hatches are closed and the covers of the control handles are installed.
(2)
On the overhead panel 25VU, make sure that the EMER EXIT LT switch 4WL is in the OFF position.
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 33-51-00Page 508 1201-299, 1May 01/05 1 1 1CES 1
(3)
On the overhead panel 25VU, make sure that the NO SMOKING switch 190RH is in the OFF position.
(4)
Reset the emergency lighting system:
-
On the Forward Attendant Panel (FAP) 120RH, push the LIGHT EMER pushbutton switch to the on position
-
On the FAP 120RH, push the LIGHT EMER pushbutton switch to the off position.
Subtask 33-51-00-710-052
B. Check battery capacity
NOTE : Make sure that the aircraft power supply stays on during this
____
test.
(1) Do this test.
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the Programming and Test Panel (PTP) 110RH:
-
push the DSPL ON membrane
switch.
-
push the SYST TEST line select key.
-
push CONT until the EMER LIGHT BATTERY display comes on.
-
push the EMER LIGHT BATTERY line select key.
-put in this users code: 3351.
-
push the ENTER line select key.
-
push the TEST EMER-LIGHT BAT membrane switch.
On the PTP 110RH:
-
the CIDS menu comes on.
-
the SYST TEST menu comes on.
-
the ENTER ACCESS CODE page comes on.
-
the EMER BATTERY TEST page and the PUSH BAT KEY display comes on.
-
the integral light of the BATmembrane switch comes on.
- on the PTP display a clock comes on and shows the time taken for the test.
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 33-51-00Page 509 1201-299, 1May 01/05 1 1 1CES 1
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------