In the cabin:
-
the emergency lighting system comeson.
-
the emergency lighting system goesoff.
On the SIGNS panel 25VU:
-
the EMER EXIT LT OFF annunciator 5WLcomes on.
R 1EFF : 051-099, 106-149, 159-199, 210-299, 1 33-51-00Page 523 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1 **ON A/C ALL
5. Close-up
________ Subtask 33-51-00-862-053
A. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
1EFF : ALL 1 33-51-00Page 524 1 1 Aug 01/05R 1 1 1CES 1
TASK 33-51-00-710-006 Operational Test of Emergency Lights not with CIDS
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific stepladder 1.5 m (4 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
FOR FIN 10WL
25-23-42-000-001 Removal of the Ceiling Panels - Forward Utility Area
25-23-42-400-001 Installation of the Ceiling Panels - Forward Utility
Area
FOR FIN 13WL
35-21-41-000-001 Removal of the Emergency Oxygen Containers
35-21-41-400-001 Installation of the Emergency Oxygen Containers
FOR FIN 11WL
25-23-41-000-001 Removal of the Ceiling Panels
25-23-41-400-001 Installation of the Ceiling Panels
25-23-44-000-001 Removal of the Lower Sidewall-Panels (Dado Panels)
25-23-44-400-001 Installation of the Lower Sidewall-Panels (Dado
Panels)
FOR FIN 12WL
25-23-41-000-001 Removal of the Ceiling Panels
25-23-41-400-001 Installation of the Ceiling Panels
25-23-44-000-001 Removal of the Lower Sidewall-Panels (Dado Panels)
25-23-44-400-001 Installation of the Lower Sidewall-Panels (Dado
Panels)
1EFF : ALL 1 33-51-00Page 525 1 1 Aug 01/05R 1 1 1CES 1
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
FOR FIN 14WL
25-23-41-000-001 Removal of the Ceiling Panels
25-23-41-400-001 Installation of the Ceiling Panels
FOR FIN 15WL
25-23-41-000-001 Removal of the Ceiling Panels
25-23-41-400-001 Installation of the Ceiling Panels
3. Job Set-up
__________
Subtask 33-51-00-861-056
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
Subtask 33-51-00-010-053-A
B. Get Access
(1)
Put the stepladder in position:
FOR 10WL
at the left FWD passenger/crew door,
FOR 13WL
between the AFT passenger/crew doors,
(2)
Remove the ceiling panel to get access to the emergency power-supply unit: FOR 10WL remove 221BC at the left FWD passenger/crew door (Ref. TASK 25-23-42-000-001).
(3)
Remove the lower sidewall panel to get access to the emergency power-supply unit: FOR 11WL remove 241KW at the left emergency exit(s) (Ref. TASK 25-23-44-000-001), FOR 12WL remove 242KW at the right emergency exit(s) (Ref. TASK 25-23-44-000-001).
(4)
Lower one side of the emergency oxygen container to get access to the emergency power-supply unit: FOR 13WL disengage and lower one side of the emergency oxygen container 33WR between the AFT passenger/crew doors (Ref. TASK 35-21-41-000-001).
NOTE : Do not disconnect the electrical connector of the emergency
____
oxygen container.
**ON A/C 301-399,
Subtask 33-51-00-010-053-B
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LIGHTS 灯光2(116)