• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 00:07来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 1. Reason for the Job__________________
 Self Explanatory
 2. Job Set-up Information______________________ 
R  A. Fixtures, Tools, Test and Support Equipment 
R R R  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R R  No specific  Torque Wrench : range 5.00 to 35.00 lbf.in (0.05 to 0.40 m.daN) 
R  B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 08-004  USA MIL-A-25457 ADHESIVE SEALANT (Ref. 20-31-00) 
R  C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
R  3 3 3 3  gasket gasket gasket gasket  33-43-11 01A-03033-43-11 01A-06033-43-11 01A-060A 33-43-11 01B-030

 

R D. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
33-43-00-710-001 Operational Test of the Runway Turnoff Lights
 33-43-11-991-003 Fig. 402

 3. Job Set-up
__________
 Subtask 33-43-11-865-056

 A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 3LC1
 122VU LIGHTING/EXT LT/RWY TURN OFF/L 1LC1 W06 FOR 3LC2 122VU LIGHTING/EXT LT/RWY TURN OFF/R 1LC2 W05
 4. Procedure
_________
 (Ref. Fig. 402/TASK 33-43-11-991-003)
 Subtask 33-43-11-420-053

 A. Installation of the Lamp
 (1) For the lamp (4):
 (a)
 Connect the two electrical terminals (5) to the lamp (4) and put it in position on its support (6). Hold it in this position.

 (b)
 If necessary, install a new gasket (3) on the retainer (2).

 (c)
 Put the retainer (2) in position. NOTE : If the retainer is twisted, replace it.


____ R (d) Install the screw (1).


R (e) TORQUE the screw (1) to between 6 and 7 lbf.in (0.06 and 0.07 R m.daN). R
 (2) For the lamp (4) (alternate configuration):
 (a)
 Clean the component interface and/or the adjacent area.

 (b)
 If necessary, install a new gasket (3) on the support (6).

 (c)
 Apply a layer of BONDING AND ADHESIVE COMPOUNDS (Material No. 08-004) to bond the new gasket (3) to the lamp unit housing.

 (d)
 Connect the two electrical terminals (5) to the lamp (4) and put it in position on its support (6). Hold it in this position.

 (e)
 Put the retainer (2) in position. NOTE : If the retainer is twisted, replace it.

____

 (f)
 Install the insulating washer (9), the washer (7), and the screw (8).

 (g)
 Tighten the screw (8) until the lamp (4) is held in position. NOTE : Make sure that there are no visual signs of distortion of


____
 the retainer (2).

 Subtask 33-43-11-865-057
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): FOR 3LC1
 -1LC1.
 FOR 3LC2

 -1LC2.
 Subtask 33-43-11-710-052

 C. Operational Test of the Runway Turnoff Lights
 (1) Do the operational test of the runway turnoff lights (Ref. TASK 33-43-00-710-001).


 5. Close-up
________ Subtask 33-43-11-942-052
 A. Make sure that the work area is clean and clear of tool(s) and other items.


 LIGHT - RUNWAY TURNOFF (3LC1,3LC2) - ADJUSTMENT/TEST
____________________________________________________
 TASK 33-43-11-730-001
 Adjustment of the Runway Turnoff Light (3LC1, 3LC2)
 WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.

_______
 WARNING : DO NOT DISCONNECT THE ELECTRICAL CONNECTIONS FOR AT LEAST 2 MINUTES

_______ AFTER YOU DE-ENERGIZE THE ELECTRICAL CIRCUITS.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LIGHTS 灯光2(16)