(2)
Clean the glazing panel with a MISCELLANEOUS (Material No. 19-003) made moist with soap solution.
(3)
Do an inspection of the component interface and/or the adjacent area.
(4)
Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 33-48-14-420-050
B. Installation of the Strobe Light
(1)
Remove the blanking caps from the disconnected electrical connectors.
(2)
Connect the electrical connector (1) to the strobe light (2).
(3)
Clean the electrical connector (1) with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-004).
(4)
Apply a continuous layer of STORAGE PRESERVATION (Material No. 15-008) to the electrical connector (1).
(5)
Install the strobe light (2) with the bolts (4) and the washers (5).
(6)
Electrically bond the aft bottom bolt (4) (Ref. TASK 20-28-00-912-004).
Subtask 33-48-14-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 10LV.
Subtask 33-48-14-710-050
D. Test
WARNING : DO NOT LOOK DIRECTLY AT THE LIGHT FLASH DURING THE TEST.
_______ SUPPLY A COVER, OR SHIELD, TO GIVE PROTECTION FROM THE LIGHT FLASH TO PERSONS IN THE TEST AREA.
WARNING : BE CAREFUL IF YOU TOUCH THE STROBE LIGHT WITH THE COVER REMOVED
_______ AND THE POWER APPLIED. SOME COMPONENTS HAVE DANGEROUS VOLTAGES.
CAUTION : DO NOT DISCONNECT THE CONNECTOR DURING OPERATION. ARCING CAN
_______
DAMAGE THE CONTACT PINS.
(1) Do the applicable operational test on the strobe light (Ref. TASK 33-48-00-710-001) (Ref. TASK 33-48-00-710-002).
Subtask 33-48-14-865-053
E. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
122VU LIGHTING/WING/STROBE 10LV V05
5. Close-up
________ Subtask 33-48-14-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the applicable glazing panel (3) (Ref. TASK 57-37-12-400-001).
Subtask 33-48-14-865-054
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 10LV.
Subtask 33-48-14-942-052
C. Removal of Equipment
(1)
Remove the safety barriers.
(2)
Remove the warning notice(s).
(3)
Remove the access platform(s).
(4)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
TASK 33-48-14-000-002 Removal of the Strobe Light Flash-Tube Assembly WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
WARNING : DO NOT TOUCH THE STROBE LIGHTS FOR AT LEAST 5 MINUTES AFTER
_______ OPERATION. THE STROBE LIGHT WILL STILL BE HOT.
WARNING : DO NOT REMOVE THE STROBE LIGHT FOR AT LEAST TEN MINUTES AFTER YOU
_______ DE-ENERGIZE THE ELECTRICAL CIRCUITS. THE HIGH VOLTAGE ELECTRICAL CURRENT IN THE CAPACITOR OF THE STROBE LIGHT IS DANGEROUS.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
No specific warning notice
No specific access platform 4.35 m (14 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LIGHTS 灯光2(58)