• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 00:07来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 1EFF : 051-051, 1 33-46-00Page 505 1 1 May 01/05 1 1 1CES 1 LIGHT - TAKE OFF (7LR) - REMOVAL/INSTALLATION


_____________________________________________
 TASK 33-46-11-000-001
 Removal of the Take Off Light (7LR)
 WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
 WARNING : DO NOT DISCONNECT THE ELECTRICAL CONNECTIONS FOR AT LEAST 2 MINUTES

_______
 AFTER YOU DE-ENERGIZE THE ELECTRICAL CIRCUITS.

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------

R **ON A/C 001-049, 052-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 33-46-11-991-001-A Fig. 401
 **ON A/C 051-051,

 33-46-11-991-001 Fig. 401A **ON A/C ALL


 3. Job Set-up
__________
 Subtask 33-46-11-865-050

 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TO 3LR W07
 4. Procedure
_________ R **ON A/C 001-049, 052-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 (Ref. Fig. 401/TASK 33-46-11-991-001-A)
 **ON A/C 051-051,

 (Ref. Fig. 401A/TASK 33-46-11-991-001)
 **ON A/C ALL

 Subtask 33-46-11-020-050
 A. Removal of the Take Off Light
 (1)
 Disconnect the electrical connector (12) from the socket (11).

 (2)
 Put the blanking caps on the disconnected electrical connector (12) and the socket (11).

 (3)
 Remove the nut (6), the washer (7), the screw (9) and the washer (8).

 (4)
 Remove the nuts (5), the washers (4), the screws (1) and the washers (2). During this operation, hold the light (10).

 (5)
 Remove the light (10) from its support (3).

 


 Take Off Light Figure 401/TASK 33-46-11-991-001-A
R 1EFF : 001-049, 052-099, 101-149, 151-199, 1 33-46-11Page 403 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1


R  Take Off Light 
R  Figure 401A/TASK 33-46-11-991-001 
R 1EFF :  051-051,  1  33-46-11 Page 404 
1  1  May 01/05
 1  1
 1CES  1

 

 TASK 33-46-11-400-001
 Installation of the Take Off Light (7LR)
 WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.

_______

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Consumable Materials
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
Material No. 05-002  USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
33-46-00-710-001 Operational Test of the Taxi and Take Off Lights 33-46-11-730-001 Adjustment of the Take Off Light (7LR)

R **ON A/C 001-049, 052-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 33-46-11-991-001-A Fig. 401
 **ON A/C 051-051,

 33-46-11-991-001  Fig. 401A **ON A/C ALL


 3. Job Set-up
__________
 Subtask 33-46-11-865-051

 A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LIGHTS 灯光2(23)