• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 23:24来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 S 167-013
 (5)  
Clean the drain hole of the pitot-static probe.

 S 167-014

 (6)  
If the drain hole is not clean, do these steps:

 (a)
Put a 0.029-inch drill rod into the drain hole.

 (b)
Put a 0.033-inch drill rod into the drain hole.

 


 NOTE: The diameter of the drain hole must be less than 0.033
____
 +0.002/-0.001 inch.

 S 427-015
 (7)  Install the pitot-static probe (AMM 34-11-11/401).
 TASK 34-11-11-107-016
 3.  External Cleaning_________________
 A. Access
 (1)  Location Zones
 101/102 Control Cabin
 202 Lower Nose Compartment

 B. Procedure
 S 867-017
 (1)  Open these circuit breakers and attach DO-NOT-CLOSE tags:
 (a)  P18 Load Control Center
 1) C1, CAPT UPPER L
 2) C2, CAPT LWR R
 3) C3, F/O UPPER R
 4) C4, F/O LWR L

 S 147-023
 WARNING:_______MAKE SURE THE PROBE HEAT IS NOT ON. THIS CAN CAUSE INJURY TO PERSONS.
 CAUTION:_______DO NOT PUT OBJECTS INTO THE STATIC PORTS. DO NOT LET SOLVENTS, OIL, OR GREASE GET ON THE PROBE. DO NOT RUB THE SURFACE OF THE PROBE TO CLEAN IT. THESE CAN CAUSE DAMAGE TO THE PITOT-STATIC PROBE.
 (2)  
Clean the pitot-static probe with clean water to remove material from the external surface.

 (3)  
Dry the pitot-static probe with a soft cloth.


 S 147-020
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 34-11-11

 ALL  ú ú 02 Page 703 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 867-021
 (4)  Remove DO-NOT-CLOSE tags and close these circuit breakers:
 (a)  P18 Load Control Center
 1) C1, CAPT UPPER L
 2) C2, CAPT LWR R
 3) C3, F/O UPPER R
 4) C4, F/O LWR L

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 34-11-11

 ALL  ú ú 01 Page 704 ú Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 STATIC PRESSURE PORT - REMOVAL/INSTALLATION
___________________________________________
 1.  General_______
 A.  This subject has two tasks. The first task is to remove the static pressure port. The second task is to install the static pressure port. The installation task includes a test of the static pressure ports.
 B.  On the 737-300 airplanes, the static pressure ports are installed at STA 430 and WL 158.10.
 C.  The 737-300 static pressure port (P/N 69-15853-3) has a flat external surface.
 TASK 34-11-21-024-001
 2.  Static Pressure Port Removal____________________________
 A.  Standard Tools and Equipment
 (1)  Sealant Removal Tool - hardwood or plastic
 B.  References
 (1)  20-10-44/401, Lockwire
 C.  Access
 (1)  Location Zone
 208 Forward Cargo Compartment

 D.  Procedure
 S 014-002
 (1)  
Remove the wall from the cargo compartment to get access to the static pressure ports.

 S 154-003

 (2)  
Clean the sealant away from the static pressure port.

 S 034-004

 (3)  
Remove the lockwire from the nut of the static pressure port (Ref 20-10-44/401).

 S 024-005

 (4)  
Remove the static pressure port (see Figure 401):


 CAUTION:_______DO NOT TWIST THE STATIC HOSE. THE ALTERNATE STATIC SYSTEM WILL NOT OPERATE CORRECTLY WITH A TWISTED HOSE.
 (a)  
Disconnect the static hose from the elbow.

 (b)  
Put a dust cap on the static hose.

 (c)  
Loosen the jamnut and remove the elbow and the O-ring from the static pressure port.


 CAUTION: MAKE SURE THE SURFACE NEAR THE STATIC PRESSURE PORT IS
_______ FREE OF DAMAGE. IF THE SURFACE CONTAINS DAMAGE, IT CAN CAUSE THE SYSTEM NOT TO ACCURATELY CALCULATE THE PRESSURE.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 导航 NAVIGATION 1(60)