-Apply the CLEANING AGENTS (Material No. 11-004) to the cloth, not the cloth to the CLEANING AGENTS (Material No. 11-004). This will prevent the transfer of contamination.
-Carefully clean a small area at a time and remove the CLEANING AGENTS (Material No. 11-004) before it becomes dry. Use a new MISCELLANEOUS (Material No. 19-003) frequently to make sure that the dirt is not put back on the surface.
-If necessary, use a brush to clean out the holes and edges.
(b)
Clean the slat surface again, where there is contamination remaining.
(c)
When the area is clean, flush with clean water.
Slat No. 5 - Painting Area and Dimensions
Figure 701/TASK 57-46-11-991-001
1EFF : ALL 1 57-46-11 Page 704
1 1 Feb 01/98
1 1
1CES 1
(d) Carefully dry the area with a new, dry MISCELLANEOUS (Material No. 19-003).
(2) Preparation for Painting
(a) If the finish paint or primer layers are damaged, do a repair (Ref. TASK 51-75-12-300-001).
(b) If necessary, carefully smooth the surface to be painted with a fine-grade SCOTCHBRITE-pad and CLEANING AGENTS (Material No. 11-004). Make sure the primer layer does not show.
(c) Remove the abrasive grit and use a new MISCELLANEOUS (Material No. 19-003), made moist with CLEANING AGENTS (Material No. 11-004) to clean the surface. Clean off the CLEANING AGENTS (Material No. 11-004) before it becomes dry. Make sure you do not touch the surface with your hand.
Subtask 57-46-11-370-050
B. Painting
R R (1) Apply the PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-003) with a brush to the prepared area on the slat rear skin and lower trailing edge.
R R (2) Apply three layers of PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-003), each layer must be 0.05 mm (0.002 in.) thick.
5. Close-up________
Subtask 57-46-11-865-053
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 5CV, 7CV.
Subtask 57-46-11-860-051
B. Aircraft Configuration
(1) Make sure that the work area is clean and clear of tool(s) and other items.
(2) Remove the access platform(s).
(3) Remove the safety barriers.
(4) Retract the slats to the zero position (Ref. TASK 27-80-00-866-005). Subtask 57-46-11-942-051
C. Removal of Equipment
(1)
Remove the warning notice(s).
(2)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
1EFF : ALL 1 57-46-11Page 706 1 1 May 01/99R 1 1 1CES 1
STRUCTURE COMPLETE - SLAT 5 - REMOVAL/INSTALLATION
__________________________________________________
TASK 57-46-21-000-001
Removal of the Spherical Bearings of the No. 5 Slat
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. Reason for the Job
__________________
R R Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
No specific warning notices
No specific access platform 4 m (13 ft. 1 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
27-84-67-000-001 Removal of the No. 5 Slat
57-46-21-991-001 Fig. 401
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WINGS 机翼3(74)