• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 12:43来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  WARNING : SUPPORT THE UNIT/ASSEMBLY OR IT WILL FALL AND BECOME DAMAGED OR_______ 
R  INJURE PERSONNEL. THE UNIT/ASSEMBLY IS HEAVY. 
R  (1) Lift and hold the flap track beam (1) in position. 
R  NOTE : The weight of the flap track beam (1) is 28 kg (61.7294 lb).____ 
R  (2) Make sure that the spigot is engaged in the flap track beam (1) 
R  correctly. 

R 1EFF : 301-399, 1 57-51-33Page 421 1 1 May 01/04 1 1 1CES 1


R  (3) At the front mounting: 
R  (a) Install the hollow bolt (12). 
R  (b) Install the washer (13) and the nut (14). 
R  (c) TORQUE the nut (14) to between 11.0 and 12.2 m.daN (81.12 and 
R  89.97 lbf.ft). 
R  (d) Safety the nut (14) with MISCELLANEOUS (Material No. 19-010). 
R  (e) Install the bolt (11), the new lockwasher (15) and the nut (16). 
R  (f) TORQUE the nut (16) to between 6.8 and 7.8 m.daN (50.14 and 57.52 
R  lbf.ft). 
R  (g) Safety the nut (16) with the lockwasher (15). 
R  (4) At the rear mounting: 
R  (a) Install the bush (8) and the hollow bolt (9). 
R  (b) Install the washer (7), the new lockwasher (6) and the nut (5). 
R  (c) TORQUE the nut (5) to between 15.3 and 16.3 m.daN (112.83 and 
R  120.20 lbf.ft). 
R  (d) Safety the nut (5) with the lockwasher (6). 
R  (e) Install the bolt (10), the washer (4) and the nut (3). 
R  (f) TORQUE the nut (3) to between 14.5 and 15.5 m.daN (106.93 and 
R  114.30 lbf.ft). 
R  (g) Install the new cotter pin (2). 
R  (5) Apply a thin layer of SEALANTS (Material No. 09-005) around: 
R  - the heads of the bolts (10) and (11) 
R  - the hollow bolts (9) and (12) 
R  - the nuts (3), (5), (14) and (16). 

R 1EFF : 301-399, 1 57-51-33Page 422 1 1 May 01/04 1 1 1CES 1

 **ON A/C ALL


 5. Close-up
________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 Subtask 57-51-33-410-050
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the No.1 flap track actuator (Ref. TASK 27-54-49-400-001).


 (3) Install the applicable inboard flap (Ref. TASK 27-54-61-400-001). **ON A/C 301-399,
 Subtask 57-51-33-410-050-A
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the LH(RH) shroud box (Ref. TASK 57-51-15-400-001).

 (3)
 Install the No.1 flap track actuator (Ref. TASK 27-54-49-400-001).


 (4) Install the applicable inboard flap (Ref. TASK 27-54-61-400-003). **ON A/C ALL
 Subtask 57-51-33-942-050
 B. Removal of Equipment
 (1)
 Remove the warning notice(s).

 (2)
 Remove the access platform(s).

 (3)
 Remove the safety barriers.

 (4)
 Remove the ground support and maintenance equipment, the special and

 

 

 standard tools and all other items.

R 1EFF : ALL 1 57-51-33Page 424 1 1 May 01/05 1 1 1CES 1 TASK 57-51-33-000-002


 Removal of the No.2 Flap Track Beam
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
 -
DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.

 -
DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.


 -MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY. INCORRECT INSTALLATION CAN CAUSE DAMAGE.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific safety barriers
 No specific warning notices
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WINGS 机翼3(141)