B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-064 GB ABP1-4053
RELEASE AGENT (Ref. 20-31-00)
Material No. 09-001 USA MIL-S-8802 TYPE I CLASS A
FUEL TANK SEALANTPOLYSULFIDE (Ref. 20-31-00)
Material No. 09-002B F ASNA 0163
FUEL TANK SEALANTPOLYSULFIDE (Ref. 20-31-00)
Material No. 09-016 USA MIL-PRF-81733D TYPE II CLASS B
CORROSION INHIBITING FILLET CONSISTENCY
(Ref. 20-31-00)
Material No. 11-026 GB DEF-STAN 68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
Material No. 19-003 USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
Material No. 19-004
WHITE TALCUM POWDER (Ref. 20-31-00)
R C. Expendable Parts
R -------------------------------------------------------------------------------R FIG.ITEM |DESIGNATION |IPC-CSN R -------------------------------------------------------------------------------
R 140 seal 57-41-37 05A-130 R 140 seal 57-41-37 05R-130 R 140 seal 57-41-37 05S-130 D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
SRM 514211
SRM 514411
SRM 574118
SRM 574126
57-41-37-991-013 Fig. 803
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
57-41-37-991-016 Fig. 804
**ON A/C 301-399,
57-41-37-991-016-A Fig. 804A R **ON A/C 106-149, 157-199, 209-299, 301-399, 401-499,
57-41-37-991-017 Fig. 805
**ON A/C ALL
57-41-37-991-014 Fig. 806
57-41-37-991-012 Fig. 809
3. Job Set-up
__________
Subtask 57-41-37-941-057
A. Job Set-up
(1)
Put warning notices in position to tell persons not to operate the slat and the pneumatic systems.
(2)
Put the access platform in position below the applicable pressure-relief panel 522CB(622CB).
Subtask 57-41-37-865-065
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 5CV B06 121VU FLIGHT CONTROLS/SLT/CTL/SYS2 7CV R21
4. Procedure
_________
(Ref. Fig. 803/TASK 57-41-37-991-013)
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
(Ref. Fig. 804/TASK 57-41-37-991-016)
**ON A/C 301-399,
(Ref. Fig. 804A/TASK 57-41-37-991-016-A) R **ON A/C 106-149, 157-199, 209-299, 301-399, 401-499,
(Ref. Fig. 805/TASK 57-41-37-991-017)
**ON A/C ALL
(Ref. Fig. 806/TASK 57-41-37-991-014, 809/TASK 57-41-37-991-012)
Leading Edge Pressure-Relief Panel 522CB(622CB) - Location and Detail Figure 809/TASK 57-41-37-991-012
1EFF : ALL 1 57-41-37Page 885 1 1 May 01/04R 1 1 1CES 1
R **ON A/C 001-049, 051-099, 101-105, 151-156, 201-208,
Subtask 57-41-37-350-055
A. Repair of the Leading Edge Pressure-Relief Panel 522CB(622CB) After it has Operated
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1)
Remove the bolts (108).
(2)
Carefully remove the pressure-relief panel 522CB(622CB) (107).
(3)
When you remove the pressure-relief panel (107), a part of the landing (102) will fall. Make a note of the position of this landing and keep it for later assembly.