R (7) Memorization of the information pertaining to the failure in the Non
R Volatile Memory (NVM)
R
R The GAPCU contains a NVM. The NVM is implemented on the EEPROM. Any
R fault identified by the GAPCU BITE is recorded in the GAPCU NVM.
R The GAPCU NVM is structured like the other type 1 computers (Ref.
R 31-32-00)-(CFDIU).
R E. Description of the Interactive Mode Function
R
R (Ref. Fig. 009, 010, 011, 012, 013, 014, 015)
R F. BITE Test Function
R
R The GAPCU has an initialization test capability and three different types
R of BITE:
R - signature/monitor,
R - isolation,
R - maintenance.
R
R Isolation BITE has the highest priority followed by maintenance BITE and
R then signature BITE.
R (1) TEST initialization
R
R Test initialization is made at power up, when the ELEC/EXT pushbutton
R switch is cycled and the watchdog has timed-out or after a
R maintenance BITE request.
R (2) Signature/monitor BITE
R
R Monitoring is performed as long as the GAPCU is powered except when
R the BITE is bypassed or if the maintenance BITE or isolation BITE has
R precedence.
R The monitor BITE does not change the contents of any RAM used by the
R control and protection software. It does not change the state of any
R of the outputs nor stimulate any sense circuitry.
R Once a given fault has been determined an indication of the fault is
R written in the NVM.
R If the same fault is detected again during the current flight, the
R number of occurrences of that fault is also indicated, up to a
R maximum of four times.
R EPGS - Maintenance Operation : LAST LEG REPORT R Figure 009
1EFF : 401-499, 1 24-41-00Page 54 1 1 Aug 01/05 1 1 1CES 1
INTENTIONALLY BLANK
1 1
24-41-00Page 55
1 1 Aug 01/05 1 1 1CES 1R EPGS - Maintenance Operation : PREVIOUS LEGS REPORT R Figure 010 (SHEET 1)
1EFF : 401-499, 1 24-41-00Page 56 1 1 Aug 01/05 1 1 1CES 1R EPGS - Maintenance Operation : PREVIOUS LEGS REPORT R Figure 010 (SHEET 2)
1EFF : 401-499, 1 24-41-00Page 57 1 1 Aug 01/05 1 1 1CES 1R EPGS - Maintenance Operation : LRU IDENTIFICATION R Figure 011
1EFF : 401-499, 1 24-41-00Page 58 1 1 Aug 01/05 1 1 1CES 1R EPGS - Maintenance Operation : GROUND REPORT R Figure 012
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ELECTRICAL POWER 电源2(75)