• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:16来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific mirrow No specific torch No specific access platform 3.4 m (11 ft. 2 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-92-19-991-001 Fig. 601 3. Job Set-up


__________ Subtask 24-92-19-860-050
 A. Aircraft Maintenance Configuration
 (1)
 Put a warning notice in the cockpit to tell persons not to operate the pitch controls.

 (2)
 Put a warning notice in position to tell persons not to pressurize the green and yellow hydraulic system.

 (3)
 Put a access platform in position below the access door 312AR.

 (4)
 Open the access door 312AR.


 4. Procedure
_________ (Ref. Fig. 601/TASK 24-92-19-991-001) Subtask 24-92-19-210-050
 A. Detailed visual inspection check of wiring between FR76 and FR77
 (1)
 Use a mirrow and a torch.

 (2)
 Look for chafing points and damage to the wire harness installation.

 (3)
 Make sure that there is a distance of 20 MM (0.7874 IN.) between the related wire harness.

 (4)
 Make sure that the work area is clean and clear of tool(s) and other items.


 5. Close-up
________ Subtask 24-92-19-860-051
 A. Aircraft Maintenance Configuration
 (1)
 Close the access door 312AR.

 (2)
 Remove the access platform(s).

 (3)
 Remove the warning notice(s).

 


 Wire Harness Installation FR76/FR77
 Figure 601/TASK 24-92-19-991-001
 1EFF :  301-399,  1  24-92-19 Page 603 
1  1  May 01/04
 1  1
 1CES  1

 

 

 


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ELECTRICAL POWER 电源2(168)