4. Procedure
_________
(Ref. Fig. 401/TASK 24-38-54-991-001)
Subtask 24-38-54-420-050
A. Installation of the Battery Shunt
(1)
Clean the component interface and/or the adjacent area.
(2)
Install the battery shunt (5).
(3)
Install the bolts (7), the washers (6) and the nuts (1).
(4)
TORQUE the nuts (1) to between 40 and 44.51 lbf.in (0.45 and 0.50 m.daN).
(5)
Install the ground cables (11), the washers (10), new lockwasher (9) and the bolts (8).
(6)
TORQUE the bolts (8) to between 53.10 and 79.65 lbf.in (0.60 and 0.90 m.daN).
(7)
Install the electrical wire (2), a new lockwasher (3) and the bolt (4).
(8)
Install the electrical wire (14), a new lockwasher (13) and the bolt (12).
(9)
TORQUE the bolts (4) and (12) to between 22.12 and 33.63 lbf.in (0.24 and 0.38 m.daN).
5. Close-up
________
Subtask 24-38-54-865-052
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
-FOR 2PB1 R 5PB1, 12PB1, 6XE, 1PR
-FOR 2PB2
5PB2, 12PB2, 6XE, 1PR
Subtask 24-38-54-410-050
B. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the access panels of the AC/DC emergency power center 106VU and the battery power center 105VU.
(3)
Close the access doors 812 and 822.
(4)
Remove the warning notice(s).
(5) Remove the access platform(s). Subtask 24-38-54-862-050
C. De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
CONTACTOR (6PB1,6PB2) - REMOVAL/INSTALLATION
____________________________________________ TASK 24-38-55-000-001 Removal of the Battery Line Contactor (6PB1, 6PB2) WARNING : MAKE SURE THAT NO AC OR DC POWER IS CONNECTED TO THE AIRCRAFT
_______ ELECTRICAL CIRCUITS. THERE IS A RISK OF ELECTROCUTION IF THE AC OR DC POWER STAYS CONNECTED.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
No specific warning notice(s)
No specific access platform 0.5 m (1 ft. 8 in.)
No specific access platform 1.8 m (5 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-38-55-991-001 Fig. 401
3. Job Set-up
__________ Subtask 24-38-55-010-050
A. Get Access
(1)
Put an access platform at the access door 822.
(2)
Open the access door 822.
(3)
Put an access platform at the access door 121AL.
(4) Open the access door 121AL. Subtask 24-38-55-941-050
B. Safety Precautions
(1)
Make sure that the external power connector is not connected to the aircraft receptacle.
(2)
Put warning notice(s) on the access door 121AL to tell the persons not to use the external power receptacle.
(3)
In the cockpit, on the overhead ELEC panel 35VU, release these pushbutton switches:
-BAT 1, BAT 2,
-APU GEN,
-GEN 1, GEN 2,
-EXT PWR.
(4)
In the cockpit, put warning notice(s) to tell persons not to operate the pushbutton switches on these overhead panels:
-21VU (EMER ELEC PWR),
-35VU (ELEC).
(5)
In the cockpit, on the APU section of the overhead panel 25VU, put warning notice(s) to tell persons not to start the APU.
4. Procedure
_________ (Ref. Fig. 401/TASK 24-38-55-991-001) CAUTION : REMOVE THE CONTACTOR ONLY AND NOT THE BASE WHERE THE WIRES ARE
_______
CONNECTED.
Subtask 24-38-55-020-051
A. Removal of the Contactor
(1)
Disconnect the connector (4).
(2)
Put blanking caps on the disconnected electrical connectors.
(3)
Loosen the two captive screws (2). NOTE : Do not remove the captive screws (2) and the spring washers