 In the forward and aft galleys:
 -Make sure that no equipment operate.
R 1EFF : 106-149, 159-199, 210-299, 301-399, 1 24-51-00Page 403 1401-499, 1Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------In the passenger cabin:
 -The CEILING and WINDOW lights go off.
 5. Close-up
________
 Subtask 24-51-00-860-053
 A. Put the aircraft back to its initial configuration.
 (1)
 Do the EIS stop procedure
 (Ref. TASK 31-60-00-860-002).


 (2)
 De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).

 

R 1EFF : 106-149, 159-199, 210-299, 301-399, 1 24-51-00Page 404 1401-499, 1Aug 01/05 1 1 1CES 1 TASK 24-51-00-440-001


 Reactivation of the Galley Supply System
 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 24-56-01 c)
 Galley Supply - Galley Supply System
 Test of Commercial

 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power TSM 24-56-00-810-801 Galley Supply Fault
 3. Job Set-up
__________
 Subtask 24-51-00-861-052
 A. Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002).

 Subtask 24-51-00-865-054
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU ELEC/GALLEY/CNTOR 7MC S28 122VU ELEC/GALY & CAB/CTL 1XA S26 123VU FWD GALLEY/FEEDER F 16MC AC10 123VU AFT GALLEY/FEEDER E 14MC AF09
 **ON A/C 301-399,
 123VU FWD GALLEY/FEEDER C 1MC AE03
R 1EFF : 106-149, 159-199, 210-299, 301-399, 1 24-51-00Page 405 1401-499, 1Aug 01/05 1 1 1CES 1


R  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------123VU FWD GALLEY/FEEDER D 2MC AE02 
R  **ON A/C 301-399, 401-499, 
R  123VU AFT GALLEY/FEEDER A  3MC  AF04 
R  **ON A/C 401-499, 
R R R  123VU AFT GALLEY/FEEDER B 123VU FWD GALLEY/FEEDER D 123VU FWD GALLEY/FEEDER C  12MC 2MC 1MC  AD09 AD04 AF09 
R  **ON A/C 106-149, 159-199, 210-299, 301-399, 401-499,
 4. Procedure_________
 Subtask 24-51-00-440-050
 A. Do the trouble shooting of the galley supply system (Ref. TSM TASK 24-56-00-810-801).
 5. Close-up________
 Subtask 24-51-00-862-051
 A. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002). 

R 1EFF : 106-149, 159-199, 210-299, 301-399, 1 24-51-00Page 406 1401-499, 1Aug 01/05 1 1 1CES 1


 AC MAIN DISTRIBUTION - ADJUSTMENT/TEST
______________________________________ TASK 24-51-00-710-001 Operational Test of the Commercial Electrical Load Shedding
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 245100-02
 Make sure that the commercial electrical load shedding is effective

 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure
 3. Job Set-up
__________ Subtask 24-51-00-861-050
 A. Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002).

R 1EFF : 106-149, 159-199, 210-299, 301-399, 1 24-51-00Page 501 1401-499, 1Aug 01/05 1 1 1CES 1


 Subtask 24-51-00-865-050
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
R  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU ELEC/GALY & CAB/CTL 1XA S26 122VU ELEC/GALY & CAB/FAULT/LT CTL 8XA S25 122VU ELEC/GALY & CAB/GND/FLT/LOGIC 7XA S24 2000VU CABIN LIGHT POWER - CEILING 307LG H08 2000VU CABIN LIGHT POWER - CEILING 304LG H07 2000VU CABIN LIGHT POWER - CEILING 306LG H06 2000VU CABIN LIGHT POWER - CEILING 305LG H05 2000VU CABIN LIGHT POWER - WINDOW 302LG H04 2000VU CABIN LIGHT POWER - WINDOW 301LG H03 2000VU CABIN LIGHT POWER - WINDOW 303LG H02 
 