R 1EFF : ALL 1 24-92-00Page 642 1 1 Feb 01/04 1 1 1CES 1 Subtask 24-92-00-869-065
B. Connect the aircraft to ground (Ref. TASK 12-34-24-869-002). Subtask 24-92-00-010-057
C. Get Access
(1)
Put the adjustable platform in position at the vertical stabilizer trailing-edge.
(2)
For the left vertical stabilizer trailing-edge.
(a) Remove and retain the access panels: 325CL, 325DL.
(3)
For the right vertical stabilizer trailing-edge.
(a) Remove and retain the access panels 325BL, 325BR.
4. Procedure
_________ Subtask 24-92-00-210-057
A. Inspection of the End Fittings of Electrical Conduits (Ref. Fig. 602/TASK 24-92-00-991-006, 612/TASK 24-92-00-991-016, 613/TASK 24-92-00-991-017)
WARNING : BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
_______
(1) At each fitting use the procedure that follows to protect against corrosion:
(a)
Use CLEANING AGENTS (Material No. 11-004) and a lint-free cloth to remove any contamination from the fitting.
(b)
Remove any flakes or blisters, make sure that the you do not damage the base metal while you do this task.
NOTE : A dental or a seal tools are recommended for the removal
____
of flakes and blisters.
(c) Use a brush or an airless spray to apply a continuous coat of STORAGE PRESERVATION (Material No. 15-008) with a thickness of
0.030 mm (0.001 in.), to cover all the fitting.
R 1EFF : ALL 1 24-92-00Page 643 1 1 Feb 01/04 1 1 1CES 1
Electrical Harness Conduits - Corrosion Protection Figure 612/TASK 24-92-00-991-016
R 1EFF : 1 1 1CES ALL 1 111 24-92-00 Page 644 Feb 01/04
Location of Conduit Fittings Figure 613/TASK 24-92-00-991-017
R 1EFF : 1 1 1CES ALL 1 111 24-92-00 Page 645 Feb 01/04
5. Close-up
________ Subtask 24-92-00-410-058
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
For the left vertical stabilizer trailing-edge.
(a) Install the access panels: 325CL, 325DL.
(3)
For the right vertical stabilizer trailing-edge.
(a) Install the access panels: 325BL, 325BR.
(4)
Disconnect the aircraft from ground (Ref. TASK 12-34-24-869-002).
(5)
Remove the access platform(s).
R 1EFF : ALL 1 24-92-00Page 646 1 1 Feb 01/04 1 1 1CES 1 TASK 24-92-00-210-010
Inspection of the End Fittings of Electrical Conduits in the Fuselage Tail Area
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN
_______ THE REFERENCED PROCEDURES.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ELECTRICAL POWER 电源2(156)