• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:16来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Open the access doors 812 and 822.

 (3)
 Open the access panels of the AC/DC emergency power center 106VU and the BATTERY power center 105VU.


 Subtask 24-38-51-865-050
 C. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 2PB1
 105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01 105VU ELEC/HOT BUS/701PP SPLY 12PB1 E01
 FOR 2PB2 105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02 105VU ELEC/HOT BUS/702PP SPLY 12PB2 E02 106VU CSM/G /EV/MAN/SPLY 6XE B04
 1EFF : ALL 1 24-38-51Page 402 1 1 May 01/04R 1 1 1CES 1


 4. Procedure
_________
 **ON A/C 001-004, 051-055,

 (Ref. Fig. 401/TASK 24-38-51-991-001) R **ON A/C 005-049, 056-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 (Ref. Fig. 401A/TASK 24-38-51-991-001-A)
 **ON A/C 001-004, 051-055,

 Subtask 24-38-51-020-050
 A. Removal of the Batteries CAUTION : BE CAREFUL WHEN YOU REMOVE THE BATTERY. IF NOT YOU CAN CAUSE
_______ DAMAGE TO THE ACCESS DOOR 822. THE BATTERY IS HEAVY.
 (1)
 Turn the knurled nut (4) by a quarter turn.

 (2)
 Disconnect the connector (5).

 (3)
 Put blanking caps on the disconnected electrical connectors.

 (4)
 Loosen the clamp (6).

 (5)
 Disconnect the ventilation duct (7) and put a blanking cap on the duct.

 (6)
 Cut and remove the lockwire from the two wing nuts (2).

 (7)
 Loosen the two wing nuts (2).

 (8)
 Release the two rods (3) that hold the battery.

 (9)
 Remove the battery (1).

 


 Batteries
 Figure 401/TASK 24-38-51-991-001

R 1EFF : 001-004, 051-055, 1 24-38-51Page 404 1 1 May 01/05 1 1 1CES 1


 Batteries Figure 401A/TASK 24-38-51-991-001-A
R 1EFF : 005-049, 056-099, 101-149, 151-199, 1 24-38-51Page 405 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1R **ON A/C 005-049, 056-099, 101-149, 151-199, 201-299, 301-399, 401-499,


 Subtask 24-38-51-020-050-A
 A. Removal of the Batteries CAUTION : BE CAREFUL WHEN YOU REMOVE THE BATTERY. IF NOT YOU CAN CAUSE
_______ DAMAGE TO THE ACCESS DOOR 822. THE BATTERY IS HEAVY.
 (1)
 Cut and remove the copper shear wire between the knurled nut (4) and the connector (5).

 (2)
 Turn the knurled nut (4) by a quarter turn.

 (3)
 Disconnect the connector (5).

 (4)
 Put blanking caps on the disconnected electrical connectors.

 (5)
 Loosen the clamp (6).

 (6)
 Disconnect the ventilation duct (7) and put a blanking cap on the duct.

 (7)
 Cut and remove the lockwire from the two wing nuts (2).

 (8)
 Loosen the two wing nuts (2).

 (9)
 Release the two rods (3) that hold the battery.


 (10) Remove the battery (1).
 **ON A/C ALL

 Subtask 24-38-51-869-051
 B. Make sure that there is no electrolyte leakage in the ventilation duct. NOTE : If there is, remove the duct, clean it and rinse it with water.
____ TASK 24-38-51-400-001


 Installation of the Batteries (2PB1, 2PB2)
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific warning notice
 No specific access platform 1.8 m (5 ft. 11 in.)

 B. Consumable Materials
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
R No specific copper shear wire Material No. 19-009 USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.5MM DIA (Ref. 20-31-00)
 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
24-38-00-710-001 Operational Test of the Battery Charge Limiter (BCL), (with the CFDS) 24-38-00-710-001 Operational Test of the Battery Charge Limiter (BCL), (without the CFDS) 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ELECTRICAL POWER 电源2(59)