(2)
In the cockpit, on the overhead panel 35VU, make sure that the BAT pushbutton switches are released.
(3) In the cockpit, on the overhead panel 35VU, make sure that the warning notice is in position to tell persons not to operate the batteries.
(4) Make sure that the access platform is in position at the access door 822.
(5) Make sure that the access door 822 is open.
(6) Make sure that the access panel of the BATTERY power center 105VU is open.
Subtask 24-38-34-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
R R R R R R R R -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 1PB1 105VU ELEC/BAT REF/BCL1 9PB1 F01 105VU ELEC/BAT BUS/REF/BCL1 8PB1 G01 FOR 1PB2 105VU ELEC/BAT REF/BCL2 9PB2 F02 105VU ELEC/BAT BUS/REF/BCL2 8PB2 J02
4. Procedure_________
(Ref. Fig. 401/TASK 24-38-34-991-001)
Subtask 24-38-34-420-050
A. Installation of the Battery Charge Limiter
(1) Install the battery charge limiter (1) on its support.
(2) Install the four screws (4) and the washers (3) and then tighten screws.
(3) Remove the blanking caps from the electrical connectors.
(4) Make sure that the electrical connectors are clean and in the correct condition.
(5) Connect the connector (2) to the battery charge limiter (1). Subtask 24-38-34-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): FOR 1PB1 8PB1, 9PB1 FOR 1PB2 8PB2, 9PB2
Subtask 24-38-34-710-050
C. Do an operational test of the BCL from the CFDS (Ref. TASK 24-38-00-710-001).
NOTE : As an alternative procedure, you can do this operational test
____
without the CFDS (Ref. TASK 24-38-00-710-001).
5. Close-up
________ Subtask 24-38-34-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the access panel of the BATTERY power center 105VU.
(3)
Close the access door 822.
(4)
Remove the warning notice(s).
(5) Remove the access platform(s). Subtask 24-38-34-862-050
B. De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
1EFF : ALL 1 24-38-34Page 406 1 1 May 01/03R 1 1 1CES 1
BATTERY (2PB1,2PB2) - REMOVAL/INSTALLATION
__________________________________________
TASK 24-38-51-000-001
Removal of the Batteries (2PB1, 2PB2)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific blanking cap
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
No specific warning notice
No specific access platform 1.8 m (5 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power
**ON A/C 001-004, 051-055,
24-38-51-991-001 Fig. 401 R **ON A/C 005-049, 056-099, 101-149, 151-199, 201-299, 301-399, 401-499,
24-38-51-991-001-A Fig. 401A **ON A/C ALL
3. Job Set-up
__________
Subtask 24-38-51-860-051
A. Aircraft Maintenance Configuration
(1)
Energize the ground service network
(Ref. TASK 24-42-00-861-001).
(2)
In the cockpit, on the overhead panel 35VU, release these pushbutton switches:
-
BAT 1,
-
BAT 2.
(3)
In the cockpit, on the overhead panel 35VU, put a warning notice in position to tell the persons not to operate the batteries.
Subtask 24-38-51-010-050
B. Get access to the Avionics Compartment
(1)
Put an access platform in position at the avionics compartment doors 812 and 822.
(2) 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM ELECTRICAL POWER 电源2(58)