R (b) If the related engine is stopped, on the ELEC control panel 35VU,
R release then push the related ELEC/GEN pushbutton switch (3XU).
R 1 Start the engine._
R 2 On the SD, on the ELEC page, make sure that the line_
R connection between the IDG1 (2) and the related busbar is
R shown green.
R (c) If the IDG1 (2) is not connected after the GCU reset, do a check
R for other CMS fault messages related to the IDG.
R (3) Make sure that there are no oil leaks.
R - Do a check of the oil level. (Ref. TASK 12-13-24-612-041)
R 5. Close-up________
R Subtask 24-21-51-410-059
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (2) Close the fan cowl doors (Ref. TASK 71-13-00-410-040):
R - FOR 1000EM1
R 437AL, 438AR
R - FOR 1000EM2
R 447AL, 448AR
R (3) Remove the warning notice(s).
R **ON A/C ALL
TASK 24-21-51-000-041 Removal of the IDG Oil Filter(s) WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______ THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO ONE HOUR.
WARNING : WEAR GOGGLES, INSULATED GLOVES AND OTHER PROTECTIVE CLOTHES.
_______
HOT OIL CAN BURN YOUR EYES AND SKIN.
IF OIL TOUCHES YOUR EYES OR SKIN, GET MEDICAL AID.
CAUTION : DO NOT LET ENGINE OIL FALL ON THE ENGINE. UNWANTED OIL MUST BE
_______ REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH THE OIL CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking cap
No specific container 1.5 USgal (5.68 l)
No specific warning notice
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-13-24-680-040 24-21-00-210-044 71-13-00-010-040 Draining of the Oil from the IDGInspection of the Filter Element(s)Opening of the Fan Cowl Doors
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
R 24-21-51-991-304 Fig. 409
R **ON A/C 401-499,
R 24-21-51-991-304-A Fig. 409A
R **ON A/C ALL
3. Job Set-up__________
Subtask 24-21-51-941-057
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a warning notice in position to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ELECTRICAL POWER 电源1(91)