(5)
Install the lifting eye (23) to the lifting boss of the generator
(4).
NOTE : Make sure that the threads of the lifting eye (23) and the
____ generator lifting boss are in good condition. Lubricate the thread of the lifting eye (23) with OILS (Material No. 03-002).
(6)
Install the shackel with the quick-release pin (25) to the lifting
eye (23).
(7)
Operate the HOIST - MINILIFT and lift the generator (4) in position to the generator mounting flange.
(8)
Lubricate the generator splined-drive-shaft (6) with OILS (Material No. 03-002).
(9)
Install the generator (4) over the nuts (15) and turn it clockwise to engage the slots.
(10)
Make sure that the dowel pin (3) fully engages in the mounting flange of the accessory drive gearbox.
(11)
TORQUE the nuts (15) to between 3.9 and 4.4 m.daN (28.76 and 32.44 lbf.ft).
(12)
TORQUE the nuts (15) behind the generator terminal with an ADAPTER -TORQUE (Ref. TASK 20-21-11-911-001).
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(13)
Clean the nuts of the APU generator with CLEANING AGENTS (Material No. 11-004).
(14)
Mark the tightened generator nuts with PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-560).
(15)
Remove the blanking caps from the electrical connectors.
(16)
Connect the electrical connector (12) to the APU generator (4).
NOTE : Make sure that you connect the electrical cable connections
____
correctly to the APU generator terminal.
(17) Connect the electrical cables (20) with the washers (21) and the nuts
(19) to the APU generator (4) as follows:
CAUTION : MAKE SURE THAT THE WASHER IS INSTALLED BETWEEN THE PHASE
_______ LEADS AND THE TERMINAL NUT. IF NOT, THE TERMINAL BLOCK WILL BURN LOCALLY BECAUSE OF RESISTANCE HEATING.
-
cable 8XS-T1 to generator terminal T1,
-
cable 8XS-T2 to generator terminal T2,
-
cable 8XS-T3 to generator terminal T3,
-
cable 8XS- N to generator terminal N.
(18)
TORQUE the nuts (19) to between 17 and 18.4 lbf.ft (2.30 and 2.49 m.daN).
(19)
Install the cover plate (18) with the washers (16) and the screws (17).
(20)
TORQUE the screws (17) to between 0.43 and 0.47 m.daN (38.05 and
41.59 lbf.in).
(21)
Install the drain plug (14) with a new sealwasher (13).
(22)
TORQUE the drain plug (14) to between 2.95 and 3.25 m.daN (21.75 and
23.96 lbf.ft).
(23)
Safety the drain plug (14) with lockwire-corrosion resistant steel
0.8 mm (0.0314 in.) dia.
B.
Visual Check
Subtask 24-23-51-210-058
CAUTION : USE ONLY APPROVED TYPES/BRANDS OF LUBRICANTS. DO NOT MIX
_______
TYPES//BRANDS OF LUBRICANTS.
(1) Do a visual check of the oil quantity on the APU oil level. Add oil if the oil level is on or less than the ADD mark on the sight glass
-
for APU GTCP 36-300
(Ref. TASK 49-90-00-600-001)
-
for APU APS 3200
(Ref. TASK 49-90-00-600-004)
-
for APU 131-9(A)
(Ref. TASK 49-90-00-600-007)
Subtask 24-23-51-865-059
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
Subtask 24-23-51-710-054
D. Start and Operate the APU
(1)
Start the APU
-
for APU GTCP 36-300
(Ref. TASK 49-00-00-860-003)
-
for APU APS 3200
(Ref. TASK 49-00-00-860-005)
-
for APU 131-9(A)
(Ref. TASK 49-00-00-860-008)
(2)
Allows the APU to run 15 minutes.
(3)
Check at 95 % speed of the APU that the generator energizes and begins to indicate voltage and frequency (without the selection of electrical loads).