• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:13来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -
cable 8XS-T1 to generator terminal T1,

 -
cable 8XS-T2 to generator terminal T2,

 -
cable 8XS-T3 to generator terminal T3,

 -
cable 8XS- N to generator terminal N.


 (15)
 TORQUE the nuts (19) to between 17 and 18.4 lbf.ft (2.30 and 2.49 m.daN).

 (16)
 Install the cover plate (18) with the washers (16) and the screws (17).


 1EFF : ALL 1 24-23-51Page 424 1 1 May 01/05R 1 1 1CES 1


 (17)
 TORQUE the screws (17) to between 0.43 and 0.47 m.daN (38.05 and

 41.59 lbf.in).

 (18)
 Install the drain plug (14) with a new sealwasher (13).

 (19)
 TORQUE the drain plug (14) to between 2.95 and 3.25 m.daN (21.75 and

 23.96 lbf.ft).

 (20)
 Safety the drain plug (14) with lockwire-corrosion resistant steel


 0.8 mm (0.0314 in.) dia.
 Subtask 24-23-51-210-051
 B. Visual Check
 CAUTION : USE ONLY APPROVED TYPES/BRANDS OF LUBRICANTS. DO NOT MIX
_______
 TYPES//BRANDS OF LUBRICANTS.

 (1) Do a visual check of the oil quantity on the APU oil level. Add oil if the oil level is on or less than the ADD mark on the sight glass
 -
for APU GTCP 36-300
 (Ref. TASK 49-90-00-600-001)


 -
for APU APS 3200
 (Ref. TASK 49-90-00-600-004)


 -
for APU 131-9(A)
 (Ref. TASK 49-90-00-600-007)

 

 Subtask 24-23-51-865-053
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 24-23-51-710-050
 D. Start and Operate the APU
 (1) Start the APU
 -
for APU GTCP 36-300
 (Ref. TASK 49-00-00-860-003)


 -
for APU APS 3200
 (Ref. TASK 49-00-00-860-005)

 

 1EFF : ALL 1 24-23-51Page 425 1 1 May 01/05R 1 1 1CES 1


 -for APU 131-9(A)
 (Ref. TASK 49-00-00-860-008)

 (2)
 Allows the APU to run 15 minutes.

 (3)
 Check at 95 % speed of the APU that the generator energizes and begins to indicate voltage and frequency (without the selection of electrical loads).

 (4)
 An 'AVAIL' message on top of the APU page shows that you can select an electric/pneumatic load.

 (5)
 Shutdown the APU

 -
for APU GTCP 36-300
 (Ref. TASK 49-00-00-860-004)


 -
for APU APS 3200
 (Ref. TASK 49-00-00-860-006)


 -
for APU 131-9(A)
 (Ref. TASK 49-00-00-860-009)

 


 (6)
 Open the APU access doors (Ref. TASK 52-41-00-010-001).

 (7)
 Do a leak check of the APU Oil System.
 NOTE : No leaks are permtted.

 

____
 ________

5. Close-up
 Subtask 24-23-51-410-051
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).

 (3)
 Remove the access platform(s).

 (4)
 Remove the warning notice(s).


 1EFF : ALL 1 24-23-51Page 426 1 1 May 01/05R 1 1 1CES 1


 TASK 24-23-51-400-001- 01
 Installation of the APU Generator 8XS with the Minilift Hoist
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  Torque Wrench : range 2.00 to 26.00 lbf.ft
 (0.20 to 3.60 m.daN) R No specific Torque Wrench : range 0.00 to 1.20 m.daN R (0.00 to 9.00 lbf.ft)
 No specific  Torque Wrench : range 0.20 to 3.60 m.daN
 (2.00 to 26.00 lbf.ft) No specific Torque Wrench : range 1.00 to 10.00 m.daN
 (8.00 to 75.00 lbf.ft) FRDH141 1 ADAPTER - TORQUE
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ELECTRICAL POWER 电源1(152)