Subtask 24-23-17-710-050
D. Operational test
(1) Do this test:
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the ECAM control panel:
-push the ELEC key to get the ELEC page
2. On the ELEC panel 35VU:
-push the GALLEY pushbutton switch.
3. In the FWD and/or AFT galleys:
-energize all the items of
equipment.
4. On the MCDU:
-do the operational test of the Ground Power Control Unit (GPCU) (Ref. TASK 24-41-00-740-002).
On the lower ECAM display unit:
-
the ELEC page comes into view.
On the panel 35VU:
-
the OFF legend of the GALLEY
pushbutton switch goes off. On the lower ECAM display unit:
-
the white GALLEY SHED indication comes into view.
On the lower ECAM display unit:
-make sure that the electricalparameters (load, voltage and frequency) of the GEN1(2) are correct.
On the MCDU, on the AC GEN page:
-the TEST OK message comes into view(after some seconds).
**ON A/C 061-099, 103-149, 151-199, 202-299, 301-399,
Subtask 24-23-17-710-050-A
D. Operational test
(1) Do this test:
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the ECAM control panel:
-push the ELEC key to get the ELEC page
2. On the ELEC panel 35VU:
-push the GALY & CAB pushbutton switch.
3. In the FWD and/or AFT galleys:
-energize all the items of
equipment.
4. On the MCDU:
-do the operational test of the Ground Power Control Unit (GPCU) (Ref. TASK 24-41-00-740-002).
On the lower ECAM display unit:
-
the ELEC page comes into view.
On the panel 35VU:
-
the OFF legend of the GALY & CAB
pushbutton switch goes off. On the lower ECAM display unit:
-
the white GALLEY SHED indication comes into view.
On the lower ECAM display unit:
-make sure that the electricalparameters (load, voltage and frequency) of the GEN1(2) are correct.
On the MCDU, on the AC GEN page:
-the TEST OK message comes into view(after some seconds).
R **ON A/C 401-499,
R Subtask 24-23-17-710-050-B
R D. Operational test
R (1) Do this test:
R -------------------------------------------------------------------------------
R ACTION RESULT
R -------------------------------------------------------------------------------
R 1. On the ECAM control panel: On the lower ECAM display unit:
R - push the ELEC key to get the - the ELEC page comes into view.
R ELEC page
R 2. On the ELEC panel 35VU: On the panel 35VU:
R - push the GALY & CAB pushbutton - the OFF legend of the GALY & CAB
R switch. pushbutton switch goes off.
R On the lower ECAM display unit:
R - the white GALLEY SHED indication
R comes into view.
R 3. In the FWD and/or AFT galleys: On the lower ECAM display unit:
R - energize all the items of - make sure that the electrical
R equipment. parameters (load, voltage and
R frequency) of the GEN1(2) are
R correct.
R 4. On the MCDU: On the MCDU, on the AC GEN page:
R - do the operational test of the - the TEST OK indication comes into
R Ground And Auxilary Power view (after some seconds).
R Control Unit (GAPCU) (Ref. TASK
R 24-41-00-740-002).
**ON A/C ALL
Subtask 24-23-17-860-052
E. Aircraft Maintenance Configuration
(1) De-energize the aircraft electrical circuits supplied from the APU (Ref. TASK 24-41-00-862-002).
Subtask 24-23-17-410-050
F. Close Access