CONTACTOR 24-28-55
REMOVAL/INSTALLATION 401 ALL
Removal of the Static Inverter 401 ALL
Contactor (2XB)
Installation of the Static 405 ALL
Inverter Contactor (2XB)
DC GENERATION 24-30-00
_____________ DESCRIPTION AND OPERATION 1 ALL General 1 ALL In Normal Configuration 1 001-049, 051-060
101-102, 201-201 Loss of the Transformer 1 001-049, 051-060 Rectifier 1 (TR1) 101-102, 201-201 In Normal Configuration 1 061-099, 103-149
151-199, 202-299
301-399, 401-499 Loss of the Transformer 2 061-099, 103-149 Rectifier 1 (TR1) 151-199, 202-299
301-399, 401-499
24-CONTENTS Page 11 Aug 01/05 R CES
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________ Loss of the Transformer 2 001-049, 051-060 Rectifier 2 (TR2) 101-102, 201-201 Loss of the Transformer 2 061-099, 103-149 Rectifier 2 (TR2) 151-199, 202-299
301-399, 401-499
Loss of the TR1 and TR2 2 ALL
Component Location 11 ALL
Spare Fuses 14 ALL
BITE Test 14 ALL
DC GENERATION 24-30-00
______________
DEACTIVATION/REACTIVATION 401 ALL
Perform a Charging Cycle on the 401 ALL
Battery Associated With the
Operative Battery Charge Limiter
(BCL)
Refer to the MMEL TASK: 24-30-03 401 ALL
Reactivation of the Battery Charge 407 ALL
Limiter 1(2)
Refer to the MMEL TASK: 24-30-03 407 ALL
Deactivation of the Transformer 408 ALL
Rectifier TR2 (1PU2)
Refer to the MMEL TASK: 24-30-01 408 ALL
Reactivation of the Transformer 411 ALL
Rectifier TR2 (1PU2)
DC GENERATION 24-30-00
______________
ADJUSTMENT/TEST 501 ALL
Operational Test of the Emergency 501 ALL
Generation System with One Normal
Transformer Rectifier (TR) Failed
DC MAIN GENERATION (TR) 24-32-00 DESCRIPTION AND OPERATION 1 ALL General 1 ALL Component Location 1 ALL Component Description 1 ALL Transformer Rectifier 1 ALL TR Characteristics 9 ALL Operation/Control and Indicating 9 ALL Normal Operation 9 ALL Failure of the TR1(2) 9 ALL Table of Main Signals 13 ALL Reset of the Protection of the 15 ALL
24-CONTENTS Page 12 Aug 01/05 R CES
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________ Transformer Rectifier (TR)
DC MAIN GENERATION (TR) 24-32-00
ADJUSTMENT/TEST 501 ALL Operational Test of the DC 501 ALL Generation Switching
TRANSFORMER RECTIFIER 24-32-51
REMOVAL/INSTALLATION 401 ALL Removal of the Transformer 401 ALL Rectifier (1PU1, 1PU2) Installation of the Transformer 404 ALL Rectifier (1PU1, 1PU2)
CONTACTOR 24-32-55
REMOVAL/INSTALLATION 401 ALL Removal of the Transformer 1(2) 401 ALL Contactor (5PU1, 5PU2, 14PU) Installation of the Transformer 411 ALL 1(2) Contactor (5PU1, 5PU2, 14PU)
DC EMERGENCY GENERATION (TR) 24-34-00 DESCRIPTION AND OPERATION 1 ALL General 1 ALL Component Location 1 ALL Component Desccription 1 ALL Essential TR 1 ALL Characteristics of the Essential 1 ALL TR Operation/Control and Indicating 1 ALL Reset of the Protection of the 4 ALL TR
DC EMERGENCY GENERATION (TR) 24-34-00
ADJUSTMENT/TEST 501 ALL Operational Test of the DC EMER 501 ALL CONFIG Caution
TRANSFORMER RECTIFIER 24-34-51
REMOVAL/INSTALLATION 401 ALL Removal of the Essential 401 ALL Transformer Rectifier (1PE) Installation of the Essential 404 ALL Transformer Rectifier (1PE)
CONTACTOR 24-34-55
REMOVAL/INSTALLATION 401 ALL
Removal of the Essential TR 401 ALL
24-CONTENTS Page 13 Aug 01/05 R CES
CHAPTER 24
__________
ELECTRICAL POWER
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ Contactor (3PE) Installation of the Essential TR 404 ALL Contactor (3PE)
DC ESSENTIAL & NORMAL GENERATION 24-35-00 SWITCHING
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Component Location 1 ALL
Operation/Control and Indicating 1 ALL
DC NORM BUS SWITCHING Contactor 1 ALL
Control (1PC1 and 1PC2)
DC ESS BUS SPLY Contactor 5 ALL
Control (4PC)
CONTACTOR 24-35-55
REMOVAL/INSTALLATION 401 ALL
Removal of the Contactor (1PC1, 401 ALL
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ELECTRICAL POWER 电源1(22)