(3)
Install the washers (9) and the screws (8) on the current transformer
(10) and tighten them.
(4)
Remove the blanking caps from the electrical connectors.
(5)
Make sure that the electrical connectors are clean and in the correct condition.
(6)
Connect the electrical connector (11) to the current transformer (10).
(7)
Install the cables (3) and (4), the washers (2) and the nuts (1) on the studs of the terminal block (5) and tighten them.
NOTE : Make sure that the location of the cables agrees with that you
____
recorded at the removal.
(8) Install the cover (7) and the screws (6) on the terminal block (5). Tighten the screws (6).
**ON A/C 001-049, 051-062, 101-105, 151-152, 201-205,
Subtask 24-22-17-420-051
B. Installation of the AC Current Transformer
FOR 42XU1, 42XU2
(Ref. Fig. 404/TASK 24-22-17-991-003)
(1)
Install the washers (2) and the screws (3) on the current transformer
(1) and tighten them.
(2)
Remove the blanking caps from the electrical connectors.
(3)
Make sure that the electrical connectors are clean and in the correct condition.
(4)
Connect the electrical connector (4) to the current transformer (1).
(5)
Connect the bars (6) to the studs of the contactor (5).
(6)
Install the washers (7) and the nuts (8) on the studs of the contactors (5) and tighten them.
1EFF : 001-049, 051-099, 101-105, 151-199, 1 24-22-17Page 427 1201-228, 301-302, 1Aug 01/05R 1 1 1CES 1
Subtask 24-22-17-420-052
C. Installation of the AC Current Transformer
FOR 42XU3, 42XU4
(Ref. Fig. 404/TASK 24-22-17-991-003)
(1)
Put the disconnected cables through the current transformer (1). NOTE : Make sure that the location and the color of the cables of
____ each bundle agree with those you recorded at the removal.
(2)
Move the current transformer (1) along the cable bundles.
(3)
Install the washers (2) and the screws (3) on the current transformer
(1) and tighten them.
(4)
Remove the blanking caps from the electrical connectors.
(5)
Make sure that the electrical connectors are clean and in the correct condition.
(6)
Connect the electrical connector (4) to the current transformer (1).
(7)
Install new cable ties.
(8)
Connect the cables (6) and (7) to the studs of the contactors (5).
(9)
Install the washers (8) and the nuts (9) on the studs of the contactor (5) and tighten them.
(10)
Connect the cables (10) to the studs of the contactor (5).
(11)
Install the washers (11) and the screws (12) on the studs of the contactor (5) and tighten them.
(12)
FOR 42XU3 In the rear panel 120VU, connect the related cables to the pin 2 of the circuit breakers connected to the AC BUS 1 busbar 1XP.
(13)
FOR 42XU4 In the rear panel 120VU, connect the related cables to the pin 2 of the circuit breakers connected to the AC BUS 2 busbar 2XP.
R 1EFF : 001-049, 051-062, 101-105, 151-152, 1 24-22-17Page 428 1201-205, 1Aug 01/05 1 1 1CES 1
(14) In the AC power center 123VU, connect the related cables to the pin 2
of the circuit breakers 11QA and 12QA.
NOTE : Make sure that the location and the color of the cables agree
____
with those you recorded at the removal.
**ON A/C 063-099, 153-199, 206-228, 301-302,
Subtask 24-22-17-420-051-A
B. Installation of the AC Current Transformer
FOR 42XU1, 42XU2
(Ref. Fig. 403A/TASK 24-22-17-991-004-A)
(1)
Install the washers (2), the screws (3), the washers (6) and the nuts
(5) on the current transformer (1) and tighten them.
(2)
Remove the blanking caps from the electrical connector (4) and the electrical receptacle.
(3)
Make sure that the electrical connectors are clean and in the correct condition.
(4)
Connect the electrical connector (4) to the current transformer (1).
(5)
Connect the bars (7) to the studs of the modules 29XN and 30XN1 (30XN2).
(6)
Install the washers (8) and the screws (9) on the studs of the modules 29XN and 30XN1 (30XN2).
(7)
TORQUE the screws (9) to between 0.73 and 0.81 m.daN (64.60 and 71.68 lbf.in).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ELECTRICAL POWER 电源1(119)