Repair for Left and Right Sides Similar Material:.0502024-T3Aluminum
StructuralRepairs
Figure801 (Sheet9 of 17)
EFFECTIVITY:
040-999
PAGE10 51-70-00Jan 10/90
PIPER AIRCRAFT
PA-42-720(Advanced Trainer)
MAINTENANCEMANUAL
B. FuselageRepairs-PressurizedSection(continued)
FuselageChannel Repair
R-12
TypicalChannelLocation -
Pressure Bulkhead F.S. 57.0
UtilizeExisting Rivet Pattern
Channel
Use 5/8" Spacingfor Additional Fasteners
1.5"
Repairfor Left and RightSidesSimilar Material:.060 2024-T3 Aluminum
StructuralRepairs Figure 801 (Sheet 10 of 17)
EFFECTIVITY: 040-999
51-70-00Jan 10/90
PIPERAIRCRAFT
PA-42-720(Advanced Trainer)
MAINTENANCEMANUAL
B. FuselageRepairs -Pressurized Section (continued)
Fuselage Skin Repair (Typical) R-13andR-14
Typical Skin RepairApplication
.31 in Minimum EdgeDistance,Typical
9.0"
Material:.0802024-T3 Clad Aluminum °
BevelSides45 X .070
StructuralRepairs Figure 801 (Sheet 11 of 17)
EFFECTIVITY:
040-999
Jan10/9051-70-00
PIPER AIRCRAFT
PA-42-720(Advanced Trainer)
MAINTENANCEMANUAL
B. Fuselage Repairs -Pressurized Section (continued)
Bulkhead Repair (continued) R-15
Bulkhead
Bulkhead
MS20470-AD4Rivets
F.S.140.0
View A- A
EFFECTIVITY: 040-999 Material:.032 2024-T3 Aluminum Structural Repairs Figure 801 (Sheet 12 of 17)
51-70-00 PAGE13
Jan 10/90
PIPERAIRCRAFT
PA-42-720(Advanced Trainer)
MAINTENANCEMANUAL
B. FuselageRepairs-PressurizedSection(continued)
LongitudinalBeamRepair R-16
TypicalLocation
PressureBulkhead
F.S.57.0 -Mid Space as Shown
MatchCenterPattern
BeamAssembly
Repairfor Left and RightSidesSimilar Material:.0402024-T3Aluminum
StructuralRepairs
Figure801 (Sheet13of 17)
EFFECTIVITY:
040-999
Jan10/9051-70-00
PIPER AIRCRAFT
PA-42-720(AdvancedTrainer)
MAINTENANCEMANUAL
B. Fuselage Repairs -Pressurized Section (continued)
Typical Pressure BulkheadChannelRepair R-17
Typical Pressure Bulkhead Channel Location
PressureBulkhead
F.S.57.00
Channel
Repairfor Left and Right Sides Similar Material:.0402024-T3Aluminum
StructuralRepairs
Figure801 (Sheet14of 17)
EFFECTIVITY:
040-999 51-70-00 PAGE15Jan 10/90
PIPER AIRCRAFT
PA-42-720 (Advanced Trainer)
MAINTENANCEMANUAL
B. Fuselage Repairs -Pressurized Section (continued)
Fuselage Station 332.0 Bulkhead Repair R-18
12 Each MS20470-AD4 --12 Each MS20470-AD4 Rivets Rivets
Existing Pattern TypicalBulkhead Location F.S. 332.0
Bulkhead Pickup Existing Pattern
-
Existing Pattern .75"
ViewA-A
Repairfor Left and Right Sides Similar Material: .051 2024-T3 Aluminum
Structural Repairs
Figure 801 (Sheet 15 of 17)
EFFECTIVITY:
Jan 10/90Jan 10/9051-70-00 040-999
PIPERAIRCRAFT
PA-42-720 (Advanced Trainer)
MAINTENANCEMANUAL
B. Fuselage Repairs -Pressurized Section (continued)
Bulkhead Repair (continued) R-19 and R-20
Bulkhead
F.S.215.0
3.0'
2.25"
1.3'
Existing Rivet Pattern
.38"
View A A
5 Each MS20470-AD4 Rivets
Material: .040 2024-T3 Aluminum
Structural Repairs
Figure801 (Sheet 16 of 17)
EFFECTIVITY:
040-999
51-70-00 PAGE
Jan 10/90
PIPERAIRCRAFT
PA-42-720(Advanced Trainer)
MAINTENANCEMANUAL
B. FuselageRepairs-PressurizedSection(continued)
FuselageSkinRepair(Typical)
R-21
-Intercostal Channel
Bulkhead
Note:
StopDrillCracksBeforeAddingDoubler
.38R
MS20470-AD4 Rivets
W.L.10.0
.38
.38 1.0
2.0
Material:.040 2024-T3Aluminum
StructuralRepairs Figure801 (Sheet17of 17)
EFFECTIVITY: 040-999
51-70-00
Jan
10/90
51-70-00
PIPERAIRCRAFT PA-42-720(Advanced Trainer) MAINTENANCEMANUAL
CHAPTER 52
LIST OF EFFECTIVE PAGES
CHAPTER SECTION PAGE DATE CHAPTER SECTION PAGE DATE
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:夏延飞机维护手册 Cheyenne IIIA PA-42-720 AMM 2(105)