24-33-02
ALL ú ú 01 Page 404 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
SINGLE TRU OPERATION RELAY - REMOVAL/INSTALLATION
_________________________________________________
1. General_______
A. This procedure has three tasks. The first task is the removal of the single TRU operation relay (R7225). The second task is the installation of the relay. The third task is an operational test of the relay.
B. Do the operational test after you install the relay.
C. The relay is installed in the P180 DC power distribution panel. The P180 panel is between the nose gear wheel well and the fuselage, on the right side. Access to the P180 panel is through an access opening, forward of the E/E compartment.
TASK 24-33-05-004-001
2. Single TRU Operation Relay Removal (Fig. 401)__________________________________
A. References
(1)
AMM 24-22-00/201, Manual Control
(2)
AIPC 24-33-01, Fig. 1
(3)
WDM 24-33-12
(4)
SSM 24-33-01
B.
Access
(1)
Location Zone 116 Area Between Nose Gear Well and Fuselage, RH
(2)
Access Panel
P180, DC Power Distribution Panel
C.
Procedure
(1)
Make sure all electrical power is off (AMM 24-22-00/201).
(2)
Open the access door on the P180 panel.
(3)
Remove the two screws that attach the relay to the panel.
S 864-002
S 014-004
S 034-005
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-33-05
ALL ú ú 01 Page 401 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
SEE A
SEE B
P180 DC POWER DISTRIBUTION PANEL
A
SINGLE TRU OPERATION RELAY (R7225)
B
Single TRU Operation Relay Installation Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-33-05
ALL ú ú 03 Page 402 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 024-006
(4) Remove the relay from the P180 panel.
TASK 24-33-05-404-007
3. Single TRU Operation Relay Installation (Fig. 401)_______________________________________
A. References
(1)
AMM 24-22-00/201, Manual Control
(2)
AIPC 24-33-01, Fig. 1
(3)
WDM 24-33-12
(4)
SSM 24-33-01
B.
Access
(1)
Location Zone 116 Area Between Nose Gear Well and Fuselage
(2)
Access Panel
P180, DC Power Distribution Panel
C.
Install the Single TRU Operation Relay
S 424-024
(1)
Install the relay:
(a)
Put the relay in its position on the P180 panel.
(b)
Install the two screws that attach the relay to the panel.
(c)
Tighten the screws.
S 414-010
(2)
Close the access door for the P180 panel.
D.
Do a Test of the Single TRU Operation Relay
S 864-043
CAUTION:_______DO NOT OPERATE THE APU DURING THIS TEST. TRANSIENTS CAN CAUSE AUTOSHUTDOWN AND DAMAGE TO THE PACKS AND APU.
(1) Supply external electrical power (AMM 24-22-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-33-05
ALL ú ú 01 Page 403 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(2) S 864-030Make sure the STORM switch, on the P5 panel, is set to OFF.
(3) S 864-031Open this circuit breaker to remove power from the ground service bus for the dome lights in the flight compartment: (a) P6, Main Power Distribution Panel 1) 6F24, FLT DK LIGHTS DOME
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 ELECTRICAL POWER 电源 2(83)