 (e)  
Selecting the battery (BAT) position of the standby power selector removes the ground from the coil of the APU standby bus transfer relay, which also switches the system to the output of the APU static inverter.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-29-00
 ALL  ú ú 08 Page 8 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL


PRIMARY FLIGHT DISPLAY-LEFT NAVIGATION DISPLAY-LEFT
FLIGHT MANAGEMENT COMPUTER-LEFT

APU START RELAY IS ENERGIZED FOR 65 SECONDS DURING APU START. (REF 49-11-00)
APU AC Standby Power Simplified Schematic
Figure 5

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-29-00
 ALL  ú ú 02 Page 9 ú Jun 10/89
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 115-VOLT AC STANDBY POWER GENERATION - ADJUSTMENT/TEST
______________________________________________________
 1.  General_______
 A.  This procedure contains two tasks. The tasks are operational tests of the 115-volt ac standby power generation system.
 B.  The first task is a short operational test. The test makes sure that the system supplies 115-volt ac power to the ac standby buses.
 C.  The second task is an operational test to make sure that all components in the system operate correctly. This test also checks to make sure that the 115-volt ac power standby bus can be powered from DC bus three. The test includes a check of these components:
 (1)
Main static inverter

 (2)
APU static inverter

 (3)
All other related components.


 TASK 24-29-00-715-054
 2.  Operational (Short) Test - 115-Volt AC Standby Power Generation (Fig. 501)_______________________________________________________________
 A.  References
 (1)
AMM 24-22-00/201, Manual Control

 (2)
WDM 24-33-21, WDM 24-33-31

 (3)
SSM 24-33-02, SSM 24-33-03

 B.  
Access

 (1)  
Location Zone
 221 Control Cabin, LH
 222 Control Cabin, RH


 C.  
Prepare for the Test

 (1)
Supply electrical power (AMM 24-22-00/201).

 (2)
Make sure the BATTERY switch, on the P5 panel, is set to ON.

 (3)
Make sure the STANDBY POWER switch, on the P5 panel, is set to AUTO.

 (4)
Make sure that data shows on the upper EICAS screen.


 S 865-147
 S 865-145
 S 865-149
 S 715-067
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-29-00
 ALL  ú ú 01 Page 501 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

CAPTAIN'S SEE A
NAVIGATION
DISPLAY

CAPTAIN'S PRIMARY FLIGHT DISPLAY
AUXILARY EICAS SCREEN FIRST OFFICER'S NAVIGATION DISPLAY
FIRST OFFICER'S PRIMARY FLIGHT DISPLAY
MAIN EICAS SCREEN
ELECTRICAL SYSTEM CONTROL MODULE
A

Electrical System Control and EFIS/EICAS Display Location

Figure 501

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-29-00
 ALL  ú ú 01 Page 502 ú Apr 10/89
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 715-143
 (5)  
Make sure data shows on the captain's primary flight display (PFD), the navigation display (ND) and the left flight management computer (FMC).

 D.
Do the Operational Test


 S 865-159
 