S 865-004
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-31-06
ALL ú ú 01 Page 501 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
APU BATTERY CHARGER - REMOVAL/INSTALLATION
__________________________________________
1. General_______
A. This procedure has two tasks. One task removes the APU battery charger (M7431). The other task installs the APU battery charger.
B. The installation task includes an operational test of the APU battery charger.
C. The APU battery charger is installed on the E-33 equipment rack with the APU battery. The E-33 equipment rack is on the left side of the aft passenger cabin. Access to the E-33 equipment rack is through the E-33 access door.
TASK 24-31-07-004-001
2. APU Battery Charger Removal (Fig. 401)___________________________
A. References
(1)
20-11-22/401, Rack-Mounted Electrical/Electronic Module
(2)
24-22-00/201, Manual Control
(3)
IPC 24-31-07 Fig. 2
(4)
WDM 24-31-21
(5)
SSM 24-31-02
B.
Access
(1)
Location Zone
271 Passenger Cabin, LH
C.
Procedure
S 864-014
(1)
Open these circuit breakers and attach DO-NOT-CLOSE identifiers:
(a)
P183 Relay Panel
1) APU BATTERY CHGR OUTPUT
2) APU BATTERY CHARGER
S 864-010
(2)
Make sure the BATTERY switch, on the P5 panel, is set to OFF and attach a DO-NOT-OPERATE tag.
S 024-003
(3)
Remove the APU battery charger from the E-33 equipment rack (Ref 20-11-22/401).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-31-07
ALL ú ú 03 Page 401 ú Jun 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
SEE A SEE B
CHARGER, M7431 APU BATTERY GROUND BATTERY APU CHARGER SEE C
A E33 EQUIPMENT RACK APU BATTERY CHARGER, M7431
ELECTRICAL
CONNECTOR
SEE D
LOCKWASHERS
NUTS
WASHER
WIRES
SCREW
WASHERS
FWD TERMINAL
BLOCK COVER APU BATTERY CHARGER B
APU Battery Charger Installation Figure 401 (Sheet 1)
G88500
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-31-07
ALL ú ú 03 Page 402 ú Feb 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
LOCK NUT
LUG WIREWASHER
WASHER BRACKET
SCREW
GROUND BUILDUP
C
CHARGER BATTERY CHARGER/CONTROLLER
INPUT: 115V 3PHASE 400HZ OUTPUT: 28V DC NOMINAL BOEING P/N: S282T003-2 MOD: SERIAL NO: ELDEC P/N: 08748/8-930-01 DATE OF MFG:
ELDEC CORPORATION LYNWOOD, WASHINGTON
D
APU Battery Charger Installation
Figure 401 (Sheet 2)
H87156
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-31-07
ALL ú ú 01 Page 403 ú Feb 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
TASK 24-31-07-404-004
3. APU Battery Charger Installation (Fig. 401)________________________________
A. Special Tools and Equipment
(1) T477W Bonding Meter
B. References
(1)
20-11-22/401 Rack-Mounted Electrical/Electronic Module
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 ELECTRICAL POWER 电源 2(65)