If the terminal lug, ground strap or stud is damaged, deformed, discolored or annealed, repair or replaced the terminal lug (SWPM 20-30-00).
NOTE: If the terminal lug is annealed, use a high temperature
____ terminal lug to replace the lug (SWPM 20-30-11).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-31-01
ALL ú ú 02 Page 608 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(g) Make sure the terminal nuts are tight.
NOTE: Use the standard torque values for the terminal nuts
____
(AMM 20-51-01/201).
(h) Put the connector togerther and install the two (2) bolts.
NOTE: Use the standard torque values for the bolts
____
(AMM 20-51-01/201).
(i)
Make sure the wires are centered in the connector openings.
(j)
Connect the electrical connector (DM7432B) to the APU battery receptacle.
(k)
Put the APU battery connector (DM7432A) into the receptacle on the APU battery. 1) Turn the knob on the connector clockwise with your hand
until it is tight. 2) Use sealing wire from the knob to one of the connector bolts.
NOTE: Sealing wire is 0.020 copper wire.
____
S 866-047
(3)
Remove the DO-NOT-CLOSE tags and close these circuit breakers:
(a)
On the P183 panel:
1) APU BAT CHGR
2) APU BATTERY BUS
(b)
On the P6 panel:
1) 6J9, APU BAT BUS APU BAT-CONT
(4)
Make sure the APU battery operates correctly on the next APU start.
(5)
Remove electrical power, if it is not necessary (AMM 24-22-00/201).
S 716-062
S 866-063
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-31-01
ALL ú ú 02 Page 609 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
MAIN BATTERY CHARGER - REMOVAL/INSTALLATION
___________________________________________
1. General_______
A. This procedure has two tasks. One task is the removal of the main battery charger (M7422). The other task is the installation of the main battery charger.
B. The installation task includes an operational test of the main battery charger.
C. The main battery charger is installed in the E-30 equipment rack, with the four TRUs and the static inverter. The E-30 equipment rack is between the nose gear wheel well and the fuselage, on the right side. Access to the E-30 equipment rack is through an access opening forward of the E/E compartment.
TASK 24-31-02-004-001
2. Main Battery Charger Removal (Fig. 401)____________________________
A. References
(1)
20-11-22/401, Rack-Mounted Electrical/Electronic Module
(2)
24-22-00/201, Manual Control
(3)
IPC 24-31-02 Fig. 2
(4)
WDM 24-31-11
(5)
SSM 24-31-01
B.
Access
(1)
Location Zone 116 Area Between Nose Gear Well and Fuselage, RH
C.
Procedure
S 864-014
(1)
Open these circuit breakers and attach DO-NOT-CLOSE identifiers:
(a)
P180 DC Power Distribution Panel
1) MAIN BAT CHARGER OUTPUT
(b)
P414 Main Power Distribution Panel
1) MAIN BATTERY CHARGER
S 864-015
(2)
Make sure the BATTERY switch, on the P5 panel, is set to OFF and attach a DO-NOT-OPERATE tag.
S 024-003
(3)
Remove the main battery charger from the E-30 equipment rack (Ref 20-11-22/401).
TASK 24-31-02-404-004
3. Main Battery Charger Installation (Fig. 401)_________________________________
A. References
(1) 20-11-22/401 Rack-Mounted Electrical/Electronic Module
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 ELECTRICAL POWER 电源 2(57)