* SEE THE WDM EQUIPMENT LIST
DC Electrical Load Distribution - Component Index
Figure 101
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-60-00
ALL ú
ú 03 Page 101
ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 FAULT ISOLATION/MAINT MANUAL
E-33 EQUIPMENT CENTER
A
DC Electrical Load Distribution - Component Location
Figure 102 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-60-00
ALL ú ú 03 Page 102 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 FAULT ISOLATION/MAINT MANUAL
APU BATTERY BUS/ TRU RCCB, C10339
DC BUS 2 RCCB, C10149 DC BUS 3 RCCB, C10150
DC BUS 1
RCCB, C10148
DC BUS 4 RCCB, C10151
INVERTER POWER/
TRU RCCB, C8844
P180
MAIN BATTERY BUS/ TRU RCCB, C8843
MAIN BATTERY
RELAY RCCB, C8842
MAIN BATTERY BUS/
MAIN BATTERY RCCB,
C8841
MAIN BATTERY HOT BUS/P6 RCCB, C8839 P180-1
INVERTER POWER/MAIN BATTERY RCCB, C8890
P180 PANEL
BFROM SHT 1
REMOTE CONTROL CIRCUIT BREAKER (EXAMPLE) DC Electrical Load Distribution - Component Location Figure 102 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-60-00
ALL ú ú 03 Page 103 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
DC ELECTRICAL LOAD DISTRIBUTION - ADJUSTMENT/TEST
_________________________________________________
1. General_______
A. This procedure contains the task for the operational test of the dc electrical load distribution. The operational test will do a test of these remote control circuit breakers:
(1)
C10148, DC BUS 1
(2)
C10149, DC BUS 2
(3)
C10150, DC BUS 3
(4)
C10151, DC BUS 4
(5)
C8839, MAIN BATTERY HOT BUS/P6
(6)
C8840, INVERTER POWER/MAIN BATTERY
(7)
C8841, MAIN BATTERY BUS/MAIN BATTERY
(8)
C8842, MAIN BATTERY RELAY
(9)
C8843, MAIN BATTERY BUS/TRU
(10)
C8844, INVERTER POWER/TRU
(11)
C10339, APU BATTERY BUS/TRU
(12)
C10340, APU BATTERY BUS/APU BATTERY
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 ELECTRICAL POWER 电源 2(125)