P6 PANEL 
A
P414 PANEL B 
AC Electrical Load Distribution - Component Location Figure 102 (Sheet 1) 
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 24-50-00
 ALL  ú ú 01 Page 103 ú Oct 10/90 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 
FAULT ISOLATION/MAINT MANUAL
GALLEY POWER 1  GROUND HANDLING  
ELCU, M481  UTILITY POWER 1  RELAY 1, R117  
ELCU, M3250  GROUND HANDLING  
RELAY 2, R118  
GROUND SERVICE  
SELECT RELAY, R14  
GROUND SERVICE BUS  
P514  UTILITY SELECT  
RELAY, R1168  
GROUND SERVICE BUS  
UTILITY TRANSFER  
RELAY, R1169  
P614  
GROUND SERVICE  
TRANSFER RELAY, R15 
GALLEY POWER 2 ELCU, M482 
UTILITY POWER 2 SEE J ELCU, M3251 
P514 AND P614 PANELS 
C 
P714 PANEL 
D 
UTILITY POWER 3 ELCU, M3252 GALLEY POWER 3 ELCU, M485 
P515 MAIN DECK CARGO HANDLING BUS RELAY 2 (R992) 
MAIN DECK CARGO HANDLING BUS RELAY 1 (R991) 
UTILITY POWER 4 ELCU, M3253 
GALLEY POWERP615
4 ELCU, M486 
P515 AND P615 PANELS 
E P715 AUX/EXT NO. 2 POWER CENTER 
F 
AC Electrical Load Distribution - Component Location (Details from Sht 1) Figure 102 (Sheet 2) 
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 24-50-00
 ALL  ú ú 03 Page 104 ú Jun 10/90 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 AC ELECTRICAL LOAD DISTRIBUTION - ADJUSTMENT/TEST
_________________________________________________
 1.  General_______
 A.  This procedure has one task to do an operational test of the ac electrical-load-distribution system. The operational test includes a test of the utility power ELCUs and the galley power ELCUs.
 TASK 24-50-00-715-001
 2.  Operational Test - AC Electrical Load Distribution (Fig. 501)__________________________________________________
 A.  References
 (1)  
24-22-00/201, Manual Control
 (2)  
WDM 24-51-11 thru 24-51-73, 24-53-21 thru 24-53-62
 (3)  
SSM 24-51-01 thru 24-51-08, 24-53-01 thru 24-53-02
 B.  
Access
 (1)  
Location Zone
 221 Control Cabin, LH
 C.  
Procedure
 S 865-002
 (1)  
Supply electrical power (Ref 24-22-00/201).
S 715-010
 (2) 
Do a test of the indicator lights for the electrical system:
 (a)  
Set the IND LTS switch, on the P5 panel, to TEST.
 (b)  
Make sure all the indicator lights for the electrical system on the P5 panel and the P461 panel come on.
 (c)  
Set the IND LTS switch to BRT.
 S 865-006
 (3)  
Make sure the BUS TIE 1, 2, 3, and 4 switches, on the P5 panel, are set to AUTO.
 (a)  
Make sure the ISLN lights on the BUS TIE switches are off.
 S 865-007
 (4)  
Make sure the OFF lights on the UTILITY switches, on the P5 panel, are off.
 (a)  
If the OFF light(s) are on, push the applicable UTILITY switch.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 24-50-00
 ALL  ú ú 01 Page 501 ú Oct 18/00 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 ELECTRICAL POWER 电源 2(102)