 30-71-17-400-001  Installation of the Waste-Water De-icing Sensor (40DU)
 52-30-00-860-001  Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
 52-30-00-860-002  Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
 30-71-53-991-002  Fig. 401
 3. Job Set-up__________
 Subtask 30-71-53-860-051
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).

 (2)
 Make sure that the access platform is in position at the door 825.


 Subtask 30-71-53-010-054
 B. Get Access
 (1)
 Make sure that the FWD cargo-compartment door 825 is open (Ref. TASK 52-30-00-860-001).

 (2)
 Make sure that the CARGO COMPT LIGHT switch 6LU is at ON.

 (3)
 Make sure that these panels are removed:
 FOR 43DU
 131GW, 131HW, 131GF, 131FF, 131SF.
 FOR 44DU, 45DU, 46DU, 47DU
 131TF, 132TF

 

 

 Subtask 30-71-53-865-054

 C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------

R C/B NOT APPLICABLE
 4. Procedure
_________
 (Ref. Fig. 401/TASK 30-71-53-991-002)
 Subtask 30-71-53-420-052

 A. Installation of the Heater Element
 (1) Preparation for installation: WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THE
_______
 SPECIAL MATERIAL.
 THIS MATERIAL IS DANGEROUS.

 (a) Clean the waste water line with CLEANING AGENTS (Material No. 11-001) and a lint-free cloth.
 (2)
 Do a visual inspection of the component interface and/or the adjacent area.

 (3)
 Put the heater element (7) in position on the line. NOTE : Make sure that the heater element is correctly installed on

____
 the bridge(s).


 (4)
 Attach the heater element (7) with the BONDING AND ADHESIVE COMPOUNDS (Material No. 08-001).

 (5)
 Connect the three wires of the heater element (7) to the terminal block.

 (6)
 Install the waste water de-icing sensor (40DU) (Ref. TASK 30-71-17-400-001).

 (7)
 Put the insulation sleeve (5) along the pipe.

 

 

 NOTE : Make sure that the glass wool mat is in correct position on
____
 the waste water line.

 (8)
 Put the BONDING AND ADHESIVE COMPOUNDS (Material No. 08-001) on the junction line of the insulation sleeve (5).

 (9)
 Put the insulation muffs (3) in position.


 (10)
 Put the adhesive tape on the junction line of the insulation muffs (3).

 (11)
 Put the velcro tape (4) in position.

 (12)
 Install the spacers (8), the clamp (9), the spacer (10) and the screw (11).

 (13)
 Tighten the screw (10).

 (14)
 Put the label, the CAUTION label (2) in position and attach them with the ties (1). FOR 43DU, 44DU Bond the waste water marker (1) and the flow direction marker (2). FOR 45DU, 46DU, 47DU Not applicable.


 NOTE : Do not damage the insulation sleeve (5) with the cable-ties.
____
 Subtask 30-71-53-865-055

 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
 breaker(s): R C/B NOT APPLICABLE
 Subtask 30-71-53-710-050
 C. Do an operational test of the waste-water ice-protection (Ref. TASK 30-71-00-710-002).

 5. Close-up
________

 Subtask 30-71-53-410-051
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 In the FWD cargo compartment, install the panel(s):
 FOR 43DU
 131GW, 131HW, 131GF, 131FF, 131SF
 FOR 44DU, 45DU, 46DU, 47DU
 131TF, 132TF


 (3)
 Set the CARGO COMPT LIGHT switch 6LU to OFF.

 (4)
 Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-002).


 (5) Remove the access platform(s). Subtask 30-71-53-862-051
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 

 THERMOSTAT (7DU,57DU) - REMOVAL/INSTALLATION
____________________________________________
 TASK 30-71-54-000-001
 