Subtask 30-45-44-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R R **ON A/C 001-049, 051-052, 054-056, 058-059, 061-099, 101-101, 103-149, 151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
49VU ANTI ICE/RAIN/RPLNT/CAPT 1DB1 D01
**ON A/C ALL
121VU COM NAV/RADAR/1 5SQ1 K13
**ON A/C 051-099,
121VU COM NAV/RADAR/2 5SQ2 K14
R R **ON A/C 001-049, 051-052, 054-056, 058-059, 061-099, 101-101, 103-149, 151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
122VU ANTI ICE/RAIN/RPLNT/F/O 1DB2 W11
**ON A/C ALL
Subtask 30-45-44-941-050
C. Put the access platform in position.
4. Procedure_________
(Ref. Fig. 401/TASK 30-45-44-991-001)
Subtask 30-45-44-020-050
A. Removal of the Spray Nozzle
(1) Hold the nut (4) and remove the nut (2) and the nozzle (1).
(2) Remove and discard the O-ring (3).
Spray Nozzle
Figure 401/TASK 30-45-44-991-001
1EFF : ALL 1 30-45-44 Page 403
1 1 Feb 01/98
1 1
1CES 1
TASK 30-45-44-400-001 Installation of the Spray Nozzle WARNING : MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE
_______ OPENED, SAFETIED AND TAGGED.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 4 m (13 ft. 1 in.)
B. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
O-ring 30-45-01 02 -060
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power 30-45-44-991-001 Fig. 401 30-45-44-991-002 Fig. 402
3. Job Set-up__________
Subtask 30-45-44-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
(2) Make sure that the access platform is in position.
Subtask 30-45-44-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R R **ON A/C 001-049, 051-052, 054-056, 058-059, 061-099, 101-101, 103-149, 151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
49VU ANTI ICE/RAIN/RPLNT/CAPT 1DB1 D01
**ON A/C ALL
121VU COM NAV/RADAR/1 5SQ1 K13
**ON A/C 051-099,
121VU COM NAV/RADAR/2 5SQ2 K14
R R **ON A/C 001-049, 051-052, 054-056, 058-059, 061-099, 101-101, 103-149, 151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
122VU ANTI ICE/RAIN/RPLNT/F/O 1DB2 W11
**ON A/C ALL
4. Procedure
_________
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ICE AND RAIN PROTECTION 防冰和排雨2(36)