1EFF : ALL 1 30-73-34Page 406 1 1 Feb 01/04R 1 1 1CES 1
HEATER ELEMENT (4DW,9DW,16DW) - REMOVAL/INSTALLATION
____________________________________________________ TASK 30-73-53-000-002 Removal of the Potable-Water De-icing Heater Elements (4DW, 9DW, 16DW)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 30-73-53-991-002 Fig. 401
3. Job Set-up
__________ Subtask 30-73-53-861-050
A. Energize the ground service network (Ref. TASK 24-42-00-861-001).
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 30-73-53Page 401 1 1 Config-1 May 01/05 1 1 1CES 1 Subtask 30-73-53-865-053
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
124VU SVCE/601PP/602PP/SPLY 1PX BB01 R
Subtask 30-73-53-010-051
C. Get Access
(1)
Put the access platform in position at the FWD cargo-compartment door
825.
(2)
Open the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-001).
(3)
Set the CARGO COMPT LIGHT switch 6LU to ON.
(4)
Remove the access panel(s):
FOR 4DW
131GW, 131HW
FOR 9DW
131HW, 131MW
FOR 16DW
131HW
4. Procedure
_________
(Ref. Fig. 401/TASK 30-73-53-991-002)
Subtask 30-73-53-020-051
A. Removal of the Heater Elements
(1)
Open the protective cover (14).
(2)
FOR 4DW, 9DW Cut the ties that hold the label (1) and the CAUTION label (2). FOR 16DW Cut the ties that hold the label (1).
R (3) FOR 4DW, 9DW Remove the flow direction marker (3) and the DRINKING WATER marker (4). FOR 16DW Not applicable.
(4)
Remove the hook and loop tape (5).
(5)
Remove the adhesive tape (6).
(6)
Remove the insulation muffs (8).
(7)
Remove the adhesive tape (11) along the glass wool mat (7).
(8)
Remove the glass wool mat (7).
(9)
Disconnect the three wires of the heater elements (10) from the terminal block.
(10)
Remove the adhesive tape (9) from the pipe (12).
(11)
Remove the heater elements (10).
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 30-73-53Page 403 1 1 Config-1 May 01/05 1 1 1CES 1
Heater Elements
Figure 401/TASK 30-73-53-991-002- 12 (SHEET 1)
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 30-73-53Page 404 1 1 Config-1 May 01/05 1 1 1CES 1
Heater Elements
Figure 401/TASK 30-73-53-991-002- 22 (SHEET 2)
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 30-73-53Page 405 1 1 Config-1 May 01/05 1 1 1CES 1
TASK 30-73-53-400-002
Installation of the Potable-Water De-icing Heater Elements (4DW, 9DW, 16DW)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ICE AND RAIN PROTECTION 防冰和排雨2(116)