ACTION RESULT -------------------------------------------------------------------------------
- Push the membrane switch - The message WAIT FOR RESPONSE flashes
adjacent to the DRAINMASTS for a few seconds.
indication. - The message DRAINMAST TEST OK comes
on.
- Push the membrane switch - The CIDS main menu page comes on.
adjacent to the RET indication.
**ON A/C 051-051,
Subtask 30-71-00-710-050-A
A. Do this test.
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. In the FWD cargo-compartment at On the control unit 5DU:
FR31:
- Push and hold the TEST - The LEDs CU and HTR come on.
pushbutton.
- Release the TEST pushbutton. - The LEDs CU and HTR go off.
2. In the AFT cargo-compartment at In the control unit 25DU:
FR52:
- Push and hold the TEST - The LEDs CU and HTR come on.
pushbutton.
- Release the TEST pushbutton. - The LEDs CU and HTR go off.
3. In the AFT cargo-compartment at On the control unit 15DU:
FR63:
- Push and hold the TEST - The LEDs CU and HTR come on.
pushbutton.
- Release the TEST pushbutton. - The LEDs CU and HTR go off.
R 1EFF : ALL 1 30-71-00Page 506 1 1 Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
4. In the cabin, on the Programming and Test Panel (PTP) 110RH:
-
Push the membrane switch DSPL ON.
-
Push the membrane switch adjacent to the SYSTEM TEST indication.
-
Push the membrane switch adjacent to the CONT indication until the DRAINMASTS page comes on.
-
Push the membrane switch adjacent to the DRAINMASTS indication.
-
Push the membrane switch adjacent to the RET indication.
**ON A/C ALL
5. Close-up
________ On the PTP:
-
The CIDS main menu page comes on.
-
The SYSTEM TEST page comes on.
-
The message WAIT FOR RESPONSE flashesfor a few seconds.
-
The message DRAINMAST TEST OK comes on.
-
The CIDS main menu page comes on.
R **ON A/C 001-049, 052-099, 101-149, 151-199, 201-299, 301-399, 401-499,
Subtask 30-71-00-860-051
A. Aircraft Maintenance Configuration
(1)
For control units:
FOR 5DU, 15DU
(2)
Install the sidewall panels 131MW, 162CW.
(3)
Close the FWD and AFT Cargo-Compartment Door (Ref. TASK 52-30-00-860-002).
(4)
De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
**ON A/C 051-051,
Subtask 30-71-00-860-051-A
A. Aircraft Maintenance Configuration
(1)
For control units:
FOR 5DU, 15DU, 25DU
(2)
Install the sidewall panels 131DW, 152FW, 162DW.
(3)
Close the FWD and AFT Cargo-Compartment Door (Ref. TASK 52-30-00-860-002).