1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 30-71-17-991-002 Fig. 401
3. Job Set-up
__________ Subtask 30-71-17-861-051
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
R 1EFF : 151-199, 401-499, 1 30-71-17Page 401 1 1 Config-2 Aug 01/05 1 1 1CES 1 Subtask 30-71-17-865-053
B. Open, safety and tag this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R C/B NOT APPLICABLE Subtask 30-71-17-010-052
C. Get Access
(1)
Put an access platform in position at the FWD-cargo compartment-door
825.
(2)
Open the FWD-cargo compartment-door 825 (Ref. TASK 52-30-00-860-001).
(3)
Set the CARGO COMPT LIGHT switch 6LU to ON.
(4)
In the FWD cargo compartment, remove the panel 131HW.
4. Procedure
_________
(Ref. Fig. 401/TASK 30-71-17-991-002)
Subtask 30-71-17-020-051
A. Removal of the Sensor
(1)
Cut and discard the cable ties of the indentification and warning labels.
(2)
Remove the velcro tape (1) that attaches the sleeve (3) around the sensor.
(3)
Remove the sleeve (3) from around the clamp sensor assembly (6) and the clamp (2).
(4)
Disconnect the two wires of the clamp sensor assembly (6) from the terminal strip.
(5)
Put blanking caps on the disconnected electrical connectors.
(6)
On the waste water pipe, remove the screws (4) and (5) from the clamp sensor assembly (6) and the clamp (2).
R 1EFF : 151-199, 401-499, 1 30-71-17Page 402 1 1 Config-2 Aug 01/05 1 1 1CES 1
Temperature Sensor
Figure 401/TASK 30-71-17-991-002
R 1EFF : 151-199, 401-499, 1 30-71-17Page 403 1 1 Config-2 Aug 01/05 1 1 1CES 1
(7)
Remove the clamp (2).
(8)
Remove the clamp sensor assembly (6).
R 1EFF : 151-199, 401-499, 1 30-71-17Page 404 1 1 Config-2 Aug 01/05 1 1 1CES 1 TASK 30-71-17-400-002
Installation of the Temperature Sensor (141DU)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 30-71-00-710-002 Operational Test of the Waste-Water Ice-Protection Heater-Elements 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 30-71-17-991-002 Fig. 401
3. Job Set-up
__________
Subtask 30-71-17-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
R 1EFF : 151-199, 401-499, 1 30-71-17Page 405 1 1 Config-2 Aug 01/05 1 1 1CES 1 Subtask 30-71-17-010-053
B. Get Access
(1)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ICE AND RAIN PROTECTION 防冰和排雨2(63)