• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:57来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  **ON A/C 106-149, 211-299,
 Subtask 30-71-34-865-058-D
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU WASTE WIP - DRAINMAST FWD 1DU B06 2000VU POT/WASTE WIP - CTL 2DW A01 2000VU POT/WASTE WIP - HTR 1DW A02 2001VU WASTE WIP - DRAINMAST AFT 11DU E01 
R  **ON A/C 151-199, 
R  Subtask 30-71-34-865-058-C 
R  B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged 
R R R R R  -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU WASTE WIP - DRAINMAST FWD 1DU D01 2001VU WASTE WIP - DRAINMAST AFT 11DU E01 

R 1EFF : 052-099, 106-149, 151-199, 211-299, 1 30-71-34Page 417 1 1 May 01/05 1 1 1CES 1 **ON A/C 201-210,


 Subtask 30-71-34-865-058-B
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
 -------------------------------------------------------------------------------
2000VU WASTE WIP - DRAINMAST FWD 1DU B06
 2001VU WASTE WIP - DRAINMAST AFT 11DU E01
 **ON A/C 301-399,
 Subtask 30-71-34-865-058-E
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
 -------------------------------------------------------------------------------
2000VU WASTE WIP - DRAINMAST FWD 1DU B06
 2000VU WASTE WIP - HEATER LINE 8DU B04
 2000VU WASTE WIP - HEATER CTL 9DU B05
 2001VU WASTE WIP - DRAINMAST AFT 11DU E01
 **ON A/C ALL
 4. Procedure
_________
R **ON A/C 001-049, 052-099, 101-149, 151-199, 201-299, 401-499,
 (Ref. Fig. 401/TASK 30-71-34-991-001)
 **ON A/C 051-051,
 (Ref. Fig. 401A/TASK 30-71-34-991-001-B) **ON A/C 301-399,


 (Ref. Fig. 401B/TASK 30-71-34-991-001-A)
 **ON A/C ALL

 Subtask 30-71-34-420-050
 A. Installation
 (1)
 Install the control unit (2) with the brackets (3), the washers (4) and the screws (5) on its support (1) and tighten.

 (2)
 Remove the blanking caps from the disconnected electrical connectors.


 (3) Connect the electrical connector (6) to the control unit (2).
 Subtask 30-71-34-710-050

 B. Do the operational test of the drainmast ice-protection (Ref. TASK 30-71-00-710-001).
 NOTE : The operational temperature of the drainmast heating circuits:
____
 -
The heater comes on at 10 +1 -1 deg. C (50.0 +1.80 -1.80 deg. F)

 -
The heater comes off at 15 +1 -1 deg. C (59.0 +1.80 -1.80 deg. F)


 5. Close-up
________ R **ON A/C 001-049, 052-099, 101-149, 211-299, 401-499,
 Subtask 30-71-34-410-050
 A. Close Access
 (1) Make sure that the work area is clean and clear of tools and other items.

R (2) FOR 5DU
 (a)
 Install the sidewall panel 131MW in the FWD cargo compartment.

 (b)
 Set the CARGO COMPT light switch 6LU to OFF.

 (c)
 Close the FWD cargo-compartment door (Ref. TASK 52-30-00-860-002).

 

 

R (3) FOR 15DU
 (a)
 Install the sidewall panel 162CW in the AFT cargo compartment.

 (b)
 Set the CARGO COMPT light switch 8LU to OFF.

 (c)
 Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).


 **ON A/C 051-051,
 Subtask 30-71-34-410-050-C
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tools and other items.

 (2)
 FOR 5DU

 (a)
 Install the sidewall panel 131MW in the FWD cargo compartment.

 (b)
 Set the CARGO COMPT light switch 6LU to OFF.

 (c)
 Close the FWD cargo-compartment door (Ref. TASK 52-30-00-860-002).

 

 (3)
 FOR 15DU

 (a) Install the sidewall panel 162CW in the AFT cargo compartment.

 (4)
 FOR 25DU

 (a) Install the sidewall panel 152FW in the AFT cargo compartment.

 (5)
 FOR 15DU, 25DU


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ICE AND RAIN PROTECTION 防冰和排雨2(70)