 Set the CARGO COMPT light switch 8LU to OFF.

 (b)
 Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).

 


R 1EFF : 001-049, 051-099, 101-149, 211-299, 1 30-71-34Page 420 1401-499, 1Aug 01/05 1 1 1CES 1 **ON A/C 151-199, 201-210,


 Subtask 30-71-34-410-050-A
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tools and other items.

 (2)
 FOR 5DU

 (a) Install the sidewall panel 131MW in the FWD cargo compartment.

 (3)
 FOR 3DW

 (a)
 Install the sidewall panel 132JW in the FWD cargo compartment.

 (b)
 Set the CARGO COMPT light switch 6LU to OFF.

 (c)
 Close the FWD cargo-compartment door (Ref. TASK 52-30-00-860-002).

 

 (4)
 FOR 15DU

 (a)
 Install the sidewall panel 162CW in the AFT cargo compartment.

 (b)
 Set the CARGO COMPT light switch 8LU to OFF.

 (c)
 Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).

 


 **ON A/C 301-399,
 Subtask 30-71-34-410-050-B
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tools and other items.

 (2)
 FOR 5DU

 (a) Install the sidewall panel 131MW in the FWD cargo compartment.

 (3)
 FOR 140DU

 (a)
 Install the sidewall panel 132JW in the FWD cargo compartment.

 (b)
 Set the CARGO COMPT light switch 6LU to OFF.

 (c)
 Close the FWD cargo-compartment door (Ref. TASK 52-30-00-860-002).

 

 (4)
 FOR 15DU

 (a)
 Install the sidewall panel 162CW in the AFT cargo compartment.

 (b)
 Set the CARGO COMPT light switch 8LU to OFF.

 (c)
 Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).

 

 


 **ON A/C ALL
 Subtask 30-71-34-862-050
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 

 DRAIN MAST (4DU,14DU,24DU) - REMOVAL/INSTALLATION
_________________________________________________
 TASK 30-71-51-000-001
 Removal of the Drain Mast
 WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
 ENVIRONMENT.

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific blanking plug
 No specific circuit breaker(s) safety clip(s)
 FOR FIN 14DU
 No specific access platform 1.5 m (4 ft. 11 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power

R **ON A/C 001-049, 052-061, 101-103, 201-203,
 30-71-51-991-001 Fig. 401 R **ON A/C 051-051,
R 30-71-51-991-001-B Fig. 401A -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------

 

R  **ON A/C 062-099, 104-149, 151-199, 204-299, 301-399, 401-499,
 30-71-51-991-001-A Fig. 401B FOR FIN 14DU, 4DU 38-10-00-614-002 Depressurization of the Potable Water System FOR FIN 4DU 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump 53-22-14-000-001 Removal of the FWD Cargo-Compartment Floor-Panels FOR FIN 14DU 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump FOR FIN 14DU, 24DU, 4DU 38-10-00-614-002 Depressurization of the Potable Water System FOR FIN 24DU 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump 53-42-14-000-001 Removal of the AFT Cargo-Compartment Floor-Panels Zone 150
 **ON A/C ALL
 3. Job Set-up
__________
 Subtask 30-71-51-861-051
 A. Energize the ground service network
 