24-42-00-861-001  Energize the Ground Service Network from the External Power 30-81-31-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 30-81-31-861-050
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 Subtask 30-81-31-010-050
 B. Get access to the Avionics Compartment
 (1)
 Put the access platform in position at the access door 811.

 (2)
 Open the access door 811.

 


 Subtask 30-81-31-865-050

 C. Open, safety and tag this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 2DD1 C/B NOT APPLICABLE
 FOR 2DD2 C/B NOT APPLICABLE
 4. Procedure
_________
 (Ref. Fig. 401/TASK 30-81-31-991-001) Subtask 30-81-31-020-050
 A. Removal of the Ice Detector
 (1)
 Disconnect the electrical connector (3).

 (2)
 Put blanking caps on the disconnected electrical connectors.

 (3)
 Remove the 6 screws (5).

 (4)
 Remove the ice detector (4).

 (5)
 Remove the seal (2).

 (6)
 Put blanking plugs on the disconnected line ends.

 


 Ice Detector
 Figure 401/TASK 30-81-31-991-001
 1EFF :  401-499,  1  30-81-31 Page 403 
1  1  Aug 01/05
 1  1
 1CES  1

 

 TASK 30-81-31-400-001
 Installation of the Ice Detector (2DD1, 2DD2)

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  access platform 2 m (6 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
20-28-00-912-004  Electrical Bonding of Components With Conductive Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)-
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power 30-81-00-710-001 Operational Test of the Ice Detection System 30-81-31-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 30-81-31-860-050
 A. Aircraft Maintenance Configuration
 (1) Make sure that the ground service network is energized
 (Ref. TASK 24-42-00-861-001).

 

 Subtask 30-81-31-010-051
 B. Get access to the Avionics Compartment
 (1) Make sure that the access platform is in position at the access door
 811.
 (2) Make sure that the accees door 811 is open. Subtask 30-81-31-865-051
 C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 2DD1
 C/B NOT APPLICABLE
 FOR 2DD2
 C/B NOT APPLICABLE
 4. Procedure
_________
 (Ref. Fig. 401/TASK 30-81-31-991-001) Subtask 30-81-31-420-050
 A. Installation of the Ice Detector
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Put the seal (2) in position on the detector (4).

 (4)
 Put the detector (4) in position on the structure (1).

 (5)
 Install the 6 screws (5) and tighten. NOTE : you must do the bonding with (Ref. TASK 20-28-00-912-004):


____
 -
FOR 2DD1 the aft bolt and washer at the left side

 -
FOR 2DD2

 


 the aft bolt and washer at the right side.
 (6)
 Remove the blanking caps from the electrical connectors.

 (7)
 Make sure that the electrical connectors are clean and in the correct condition.


 (8) Connect the electrical connector (3). Subtask 30-81-31-865-052
 