D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 24-42-00-862-001 30-45-00-720-002 Energize the Ground Service Network from the External PowerDe-energize the Ground Service Network Supplied from the External PowerFunctional Test of the Rain Repellent System.
R R **ON A/C 001-049, 051-052, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
30-45-00-991-006-A Fig. 401
R R **ON A/C 001-049, 051-052, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499,
3. Job Set-up__________
R R **ON A/C 001-049, 051-052, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
Subtask 30-45-00-100-054
A. Cleaning Instructions. Make sure that the fluid does not stay on the aircraft furnishing. If the fluid gets on the aircraft furnishings, clean with CLEANING AGENTS (Material No. 11-010).
Subtask 30-45-00-861-057
B. Energize the ground service network (Ref. TASK 24-42-00-861-001)
Subtask 30-45-00-010-056
C. Open the access door of the rain-repellent fluid-gage assembly.
R 1EFF : 001-049, 051-052, 054-099, 101-149, 1 30-45-00Page 413 1151-199, 201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1
Subtask 30-45-00-865-065
D. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R R **ON A/C 001-049, 051-052, 054-056, 058-059, 061-099, 101-101, 103-149, 151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
49VU ANTI ICE/RAIN/RPLNT/CAPT 122VU ANTI ICE/RAIN/RPLNT/F/O 1DB1 1DB2 D01W11
R R **ON A/C 001-049, 051-052, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
Subtask 30-45-00-941-065
E. On the panels 21VU and 22VU, put a warning notice in position to tell persons not to operate the RAIN RPLNT pushbutton switches.
Subtask 30-45-00-941-067
F. Preparation (Ref. Fig. 401/TASK 30-45-00-991-006-A)
(1) Remove seal the (12), the union (10) and the cap (11) from the top part of the fluid-gage assembly (5).
(2) Connect a hose to the drain valve (4) of the rain repellent fluid gage assembly (5).
(3) Put the hose outlet in a container 3 l (0.80 USgal).
R R **ON A/C 001-049, 051-052, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499,
4. Procedure_________
R R **ON A/C 001-049, 051-052, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
(Ref. Fig. 401/TASK 30-45-00-991-006-A)
R 1EFF : 001-049, 051-052, 054-099, 101-149, 1 30-45-00Page 414 1151-199, 201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 30-45-00-420-056
A. Install the new rain-repellent fluid can
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Remove the blanking plug from the new can (1).
(4)
Install a new seal (3) on the can (1).
(5)
Install the can (1) on its receptacle. NOTE : The instructions for the assembly are given on the plate
____
adjacent to the can.
(6)
Put the clamp (2) in the correct position on the can (1). Tighten the clamp (2).
Subtask 30-45-00-210-054
B. Inspection/Check
(1)
Push the pushbutton switch (6) of the fluid gage (5).
(2)
Make sure that the fluid level is correct and increases to the correct pressure.
(3) Make sure that there are no leaks. Subtask 30-45-00-720-053
C. Do a functional test of the rain repellent system. (Ref. TASK 30-45-00-720-002)
R 1EFF : 001-049, 051-052, 054-099, 101-149, 1 30-45-00Page 415 1151-199, 201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1
R R **ON A/C 001-049, 051-052, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499,
5. Close-up________