Control Unit
Figure 401/TASK 30-73-34-991-001
1EFF : ALL 1 30-73-34 Page 403
1 1 Feb 01/98
1 1
1CES 1
TASK 30-73-34-400-001
Installation of the Potable and Waste Water Ice Protection Control Unit (3DW)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power 30-73-00-740-001 BITE Test of the Potable Water Ice-Protection 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 30-73-34-991-001 Fig. 401
3. Job Set-up
__________ Subtask 30-73-34-860-050
A. Aircraft Maintenance Configuration
(1)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
(2)
Make sure that the access platform is in position at the FWD cargo-compartment door 825.
Subtask 30-73-34-010-052
B. Get Access
(1)
Make sure that the FWD cargo-compartment door 825 is opened (Ref. TASK 52-30-00-860-001).
(2)
Make sure that the CARGO COMPT LIGHT switch 6LU is set to ON position.
(3)
In the cargo-compartment, make sure that the sidewall panel 132KW is removed.
Subtask 30-73-34-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------2000VU WATER SYSTEM ICE PROT HTR 1DW D07 2000VU WATER SYSTEM ICE PROT CTL 2DW D08
4. Procedure
_________
(Ref. Fig. 401/TASK 30-73-34-991-001)
Subtask 30-73-34-420-050
A. Installation of the Potable and Waste Water Ice Protection Control Unit
(1)
Put the control unit (3) on the rack.
(2)
Remove the blanking caps from the electrical connectors.
(3)
Push the control unit (3) fully into position. The mechanical pushbutton comes out with a click.
(4)
Connect the connector (4) to the control unit (3).
5. Close-up
________
Subtask 30-73-34-865-052
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s): R 1DW, 2DW Subtask 30-73-34-740-051
B. Do the BITE test of the potable water ice-protection (Ref. TASK 30-73-00-740-001).
Subtask 30-73-34-410-050
C. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the sidewall panel 132KW.
(3)
Set the CARGO COMPT LIGHT switch 6LU to off.
(4)
Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-002).
(5) Remove the access platform(s). Subtask 30-73-34-862-050