• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:57来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific cooling spray
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power FOR FIN 56DU, 6DU 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump FOR FIN 6DU 53-22-14-000-001 Removal of the FWD Cargo-Compartment Floor-Panels 53-22-14-400-001 Installation of the FWD Cargo-Compartment
 Floor-Panels FOR FIN 56DU 53-42-14-000-001 Removal of the AFT Cargo-Compartment Floor-Panels
 Zone 150 53-42-14-400-001 Installation of the AFT Cargo-Compartment Floor-Panels Zone 150
 1EFF : 051-051, 1 30-71-00Page 516 1 1 Aug 01/05R 1 1 1CES 1


 3. Job Set-up
__________
 Subtask 30-71-00-861-053
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
 Subtask 30-71-00-865-070
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU ICE PROT CARGO DRAIN VALVE 20DU D04 2001VU ICE PROT CARGO DRAIN VALVE 32DU D08
 Subtask 30-71-00-010-051
 C. Get Access
 (1)
 FOR 6DU, 56DU

 -Open the FWD and AFT cargo-compartment door (Ref. TASK 52-30-00-860-001).
 -Set the CARGO COMPT LIGHT switches to ON.

 (2)
 FOR 6DU

 -Remove the FWD cargo-compartment floor panels 131TF, 132TF, (Ref. TASK 53-22-14-000-001).

 (3)
 FOR 56DU Remove the AFT cargo-compartment floor panels 151AG, 152AG, (Ref. TASK 53-42-14-000-001).


 1EFF : 051-051, 1 30-71-00Page 517 1 1 Aug 01/05R 1 1 1CES 1

 4. Procedure
_________

 Subtask 30-71-00-720-050
 A. Do this test.
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. At FR33 (FR58), on the FWD (AFT)  At the FWD (AFT) air stop drain-valve: air stop drain-valve:
 -Loosen the insulation and apply  - The heating disk 6DU (56DU) becomes cooling spray on the thermostat warm. 7DU (57DU) for at least 10 seconds.
 5. Close-up
________
 Subtask 30-71-00-410-052
 A. Close Access
 (1)
 FOR 6DU

 -Install the FWD cargo-compartment floor panels 131TF, 132TF, (Ref. TASK 53-22-14-400-001).

 (2)
 FOR 56DU

 -Install the AFT cargo-compartment floor panels 151AG, 152AG, (Ref. TASK 53-42-14-400-001).

 (3)
 FOR 6DU, 56DU


 -Set the CARGO COMPT LIGHT switches to OFF.
 -Close the FWD and AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).
 Subtask 30-71-00-862-054
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).

 

R SENSOR - TEMPERATURE (40DU,50DU) - REMOVAL/INSTALLATION
_______________________________________________________
 TASK 30-71-17-000-001
 Removal of the Waste-Water De-icing Sensor (40DU)

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
 No specific access platform 2 m (6 ft. 7 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ICE AND RAIN PROTECTION 防冰和排雨2(60)